BALFOUR BEATTY CIVIL ENGINEERING LIMITED
A66 - FRC
The package covers, but is not limited to, the following structural components: Abutments, including bearing shelves, backwalls, and associated retaining elements Wing walls including reinforcement details, formwork, concrete placement, and tie-ins Central pier, where applicable, based on design Placing of pre-cast deck panels, including the stitched slab, diaphragms, upstands and any longitudinal or transverse construction joints Installation precast parapet plinths and associated edge thickening or upstand requirements Any additional minor or connecting works required to complete the structure to specification In addition to the primary structural FRC installation, the package includes full responsibility for all associated temporary works and ancillary requirements, including: Temporary works design, supply and installation, inclusive of falsework, propping, support systems, working platforms and stability measures Testing and control activities, including concrete cube testing, slump testing, rebar inspection hold points, and pour records Curing systems and processes including curing membranes, coverings, and controlled curing regimes Concrete temperate monitoring, including the provision and management of sensors where required Access and edge protection systems including surface preparation, treatment, defect rectification (if required) and final concrete finishes All labour, plant, materials, consumables, and supervision to deliver a fully compliant structure The contractor will be required to coordinate their works with adjacent section 3b activities and provide all necessary RAMS, ITPs, quality records, and as-built-information to support completion of Centre Parcs overbridge.
What the supplier must deliver
Any additional minor or connecting works required
Any additional minor or connecting works required to complete the structure to specification.
Temporary works design, supply and installation, inclusive
Temporary works design, supply and installation, inclusive of falsework, propping, support systems, working platforms and stability measures.
All labour, plant, materials, consumables, and supervision
All labour, plant, materials, consumables, and supervision to deliver a fully compliant structure.
The contractor will be required to coordinate
The contractor will be required to coordinate their works with adjacent section 3b activities and provide all necessary RAMS, ITPs, quality records, and as-built-information to support completion of Centre Parcs overbridge.
Derived from the notice text — always confirm against the original documents.
Make the case to bid
Reveal who to approach at BALFOUR BEATTY CIVIL ENGINEERING LIMITED, and generate a go-to-market strategy from their news, accounts and people.
- OCID
- 15b9dd11-eb63-4e2b-938a-111669d769b5
- Stage
- contract · Contract
- Source
- Contracts Finder
- Buyer ref
- A66 - FRC
Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.
Who wins this kind of work
The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.
Top suppliers & buyers in Construction
Assembling the market network…
BALFOUR BEATTY CIVIL ENGINEERING LIMITED’s tender network
Assembling the network…