RFP QuestBeta
ClosedStage · contract

ST GILBERT'S CHURCH OF ENGLAND PRIMARY SCHOOL

Redevelopment of EYFS Outdoor Area

Construction MaterialsCPV 44000000 45000000 50000000 92000000
ValueValue not published
Deadline14 Feb 2025
Published31 Jan 2025
RegionNationwide
Timeline
Published 31 Jan 2025ClosedCloses 14 Feb 2025
Match for your company
Sign up free to see how well this tender matches your company — the score, the signals that align, and where the gaps are.
The brief

1 Introduction 1.1 Company Background St Gilbert's Church of England Primary School (known as 'the School') is a standalone primary academy.

Academy status was granted in January 2013.

Located to the West of the historic town centre of Stamford, the school currently has 300 pupils form 4 - 11 years of age.

The current school buildings were established in the early 1970's with a further addition at the beginning of the 2000's. 'The School' is currently rated 'Good' by OFSTED 1.2 Project Background The existing outdoor play area was installed circa 2008/9 and included: • Wet pour safe play surface throughout • Outdoor secure storage for resources • Activity areas and play equipment The equipment is now at the end of its economic life and 'the School' are looking to redesign the existing area with a space that is inviting and inspirational for the pupils in the Reception phase of the school 1.3 High Level Overview of Requirements Bidders are asked to submit a formal tender for the redevelopment of the Early Years outdoor play area .

1.4 Existing Provision The existing provision has the following equipment installed: • Wooden picket boundary fencing • Wet pour safe play surface throughout • Central climbing frame and slide • Sand pit • Mud pit with activity panels • Secure storage for outdoor resources • Raised bed planter • Covered activity area See appendix 1 for photographs of the existing provision To create and inviting and inspirational outdoor play area for use by pupils in the Early Years (Reception) phase.

Key requirements are: • Removal/recycling of existing facilities including surfacing and timber structures • Ensuring compliant foundations for any new surfacing or structures • Design service to be completed in collaboration with 'the School' • Provision of equipment that will aid the physical development of all pupils • Provision of equipment that will encourage the joy of learning • Provision of equipment that enables creativity in play • Creative design that will enhance the natural world • A safe play surface and equipment compliant with BSEN1176 and BSEN1177 • Where possible, as much of the materials to be used are from recycled or sustainable sources • Provision of a full maintenance schedule • Use of qualified/registered installers • All contractors to be DBS checked

What this bid requires

Skills, tools & certifications

Detected from the notice — the capabilities and credentials this bid calls for. Click one to see who wins that work.

Buyer intelligence

Make the case to bid

Reveal who to approach at ST GILBERT'S CHURCH OF ENGLAND PRIMARY SCHOOL, and generate a go-to-market strategy from their news, accounts and people.

Source & provenance
OCID
15e73579-c9ce-4ede-a999-b77dc2a7142a
Stage
contract · Contract
Source
Contracts Finder
Buyer ref
STG/EYFS/2025
View the original notice on Contracts Finder

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

Market context

Who wins this kind of work

The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.

Top suppliers & buyers in Construction Materials & Structures

Assembling the market network…

ST GILBERT'S CHURCH OF ENGLAND PRIMARY SCHOOL’s tender network

Assembling the network…