RFP QuestBeta
Awarded · ResultStage · contract

Torus 62 Ltd.

GB-Rainford, St Helens: Highcross Remedial Works

ConstructionCPV 45453100 45262700 45453000 45211341 45211200 45210000
Value£155k
Awarded17 Jul 2016
Published4 Aug 2016
RegionNorth West
Outcome — awarded

This is a contract result notice, not an open opportunity. Details from the official award data.

Contract value in context
£155ktotal contract value
median £158k
this tender£0£6.5m

This sits in the lower-middle of the Construction band — a mid-scale opportunity. Based on 64,002 valued Construction tenders in our corpus.

The brief

The properties in question are newly constructed retirement flats located within a purpose built complex, the flats were built circa 2010.

The block contains 18nr flats and is located in the Rainford area of St.

Helens, Merseyside. (WA11 8GF).

Tender Documentation to be returned via the Tenderbox rather than via post.

Form of Tender along with Schedule of works should be submitted before the tender deadline.

The individual flats are suffering from water ingress/ damp around the bay windows.

To determine the cause of the water ingress/ damp it was arranged that the external render would be hacked off and to expose the steel member that is located within the cavity wall.

During the investigation it was noted that the windows cills were installed incorrectly and any rain water was running back towards the property and soaking the internal walls.

It was also noted during the inspection that the steel member had minimal to no insulation to encase it, there was also no insulation in the cavity walls, this will be causing cold spots to the internal walls along the bay windows.

Additional investigations were carried out to locate the water ingress to the internal ground floor wall located in the entrance communal hallway.

On the first floor walkway a number of concrete flags were lifted and water applied to the surface below the concrete flags.

It was noted that the water was falling away from the rain water gullies, and pooling above the ground floor communal hallway.

It is believed that the water is finding a way through the surface of the first floor walkway and this is what is causing the dampness to the communal walls below.

An investigation of the gutters indicated that the gutters were installed incorrectly and are not falling towards the outlets, which is causing the gutters to over flow when there is heavy persistent rainfall.

This will be a contributory factor to the water ingress, please note that the existing gutters are integrated as part of the roof design, further roof repairs might be required.

Key requirements

What the supplier must deliver

01

Form of Tender along with Schedule

Form of Tender along with Schedule of works should be submitted before the tender deadline.

02

This will be a contributory factor

This will be a contributory factor to the water ingress, please note that the existing gutters are integrated as part of the roof design, further roof repairs might be required.

Derived from the notice text — always confirm against the original documents.

Buyer intelligence

Make the case to bid

Reveal who to approach at Torus 62 Ltd., and generate a go-to-market strategy from their news, accounts and people.

Source & provenance
OCID
1803018f-eaff-4edc-84e5-88e309eb2825
Stage
contract · Contract
Source
Contracts Finder
Buyer ref
BIP213309296
View the original notice on Contracts Finder

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

Market context

Who wins this kind of work

The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.

Top suppliers & buyers in Construction

Scroll to explore the market network

Torus 62 Ltd.’s tender network

Assembling the network…

Also open now

Similar open tenders

26-E-STAN07-FOC08-INTERFLEX-Wretham Camp-INTERFLEX Remediation (Work Package 9 - B CAMP Roof Winterisation)

Ministry of Defence

Closes 21 Aug 2026Construction
Value not publishedValue

26-E-STAN07-FOC08-INTERFLEX-Wretham Camp-INTERFLEX Remediation (Work Package 8 - A CAMP Roof Winterisation)

Ministry of Defence

Closes 21 Aug 2026Construction
Value not publishedValue