Eiffage Kier JV HS2 Main Civils Works, Lots C2 & C3
EKFB JV - Precast Concrete UTX (Under Track Crossing) chambers system and adjoining duct works
This sits in the upper-middle of the Construction Materials & Structures band — a substantial contract for the sector. Based on 10,341 valued Construction Materials & Structures tenders in our corpus.
NC2A is the North Chilterns to Aylesbury section of C23, a part of the HS2 project managed by the EKFB Joint Venture.
We are seeking a specialist subcontractor to undertake the following works within the NC2A section: The Subcontract Works include the provision of all management, labour, materials, plant and equipment, supervision, and other resources necessary and ancillary to safely and correctly complete the installation and handover of Precast Concrete UTX (Under Track Crossing) chamber system and adjoining ducts , as described in the specifications, drawings, HS2 standards Requirements and local authority specifications.
The UTX system comprises segmented precast concrete chambers with precast concrete covers, seated on a precast concrete base.
The precast chambers and covers shall be supplied and delivered to site by the Contractor for installation by the Subcontractor.
Contractor will Undertake excavation works to the UTX duct formation level, subcontractor will complete excavation for installation of UTX Chambers and ducts.
The Subcontract works include, but are not limited to: Dewatering of excavations as required.
Provision of edge protection to ensure that excavation is safe for works Protection of all existing assets Setting out the UTX in accordance with the design and specifications, using primary control points provided by the Contractor.
Transfer UTX Chambers from Laydown Area to point of installation Installation of the UTX system comprising segmented precast concrete chambers using methodology provided in detailed design Install all units onto the precast concrete base slabs provided by the Contractor.
Install the full precast assembly, including the Precast concrete chamber segments and Precast concrete covers Install all components in accordance with the approved drawings, specified line and level, and manufacturer's instructions.
Supply and install all associated ducting, ensuring compliance with project specifications and drawings.
As part of installation, CBGM / Cast in situ concrete - minimum FND4 concrete around UTX and ducts to be done by Subcontractor Testing and handover
What the supplier must deliver
The precast chambers and covers shall
The precast chambers and covers shall be supplied and delivered to site by the Contractor for installation by the Subcontractor.
Provision of edge protection to ensure
Provision of edge protection to ensure that excavation is safe for works.
Supply and install all associated ducting, ensuring
Supply and install all associated ducting, ensuring compliance with project specifications and drawings.
Derived from the notice text — always confirm against the original documents.
Make the case to bid
Reveal who to approach at Eiffage Kier JV HS2 Main Civils Works, Lots C2 & C3, and generate a go-to-market strategy from their news, accounts and people.
- OCID
- 183433b7-20fc-4d4b-827c-d1e515bf47bf
- Stage
- contract · Contract
- Source
- Contracts Finder
- Buyer ref
- C4N114690987
Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.
Who wins this kind of work
The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.
Top suppliers & buyers in Construction Materials & Structures
Assembling the market network…
Eiffage Kier JV HS2 Main Civils Works, Lots C2 & C3’s tender network
Assembling the network…
Similar open tenders
London and Quadrant Housing Trust - Supply/Distribution of Concrete Blocks Dynamic Purchasing System (DPS
L&Q Group
London and Quadrant Housing Trust - Supply/Distribution of Concrete Blocks Dynamic Purchasing System (DPS
London and Quadrant Housing Trust