Ministry of Defence

Supply Chain Notice: WAT0132-01 - 2 new high capacity de-watering pumps at Portsmouth Naval Base

Industrial MachineryCPV 42000000 42100000 42120000 42122000
ValueValue not published
Deadline5 Jan 2024
Published7 Dec 2023
RegionSouth East
Timeline
Published 7 Dec 2023ClosedCloses 5 Jan 2024
Match for your company
Sign up free to see how well this tender matches your company — the score, the signals that align, and where the gaps are.
The brief

The Tenderer should be aware that the works detailed in this package are constrained due to the nature of the location they are to be conducted in.

Project location HM Naval Base Portsmouth The Contractor shall be expected to adhere by the HMNB site security requirements, all Contractors and Sub-Contractors shall be BPSS security vetted and will be required to hold the relevant site security passes.

The Contractor shall be expected to hold the following levels of insurance £10m Public Liability, £10m Product Liability, £5m Professional Indemnity.

KBS Maritime - Introduction KBS Maritime is a joint venture between KBR and BAE Systems, bringing together two global players with a rich heritage of delivering excellence, innovation and reliability.

The joint venture will combine the expertise of KBR as a global leader in infrastructure asset management and services with BAE Systems' experience and capability within Portsmouth Naval Base.

KBS Maritime are delivering an ambitious, modern and enduring change to the Portsmouth Naval base infrastructure, securing investment in the local community and ensuring fit-for-purpose, world-leading fleet support for the Royal Navy and the UK in the decades ahead.

Project Background KBS Maritime have a requirement for 2 new high capacity de-watering pumps to replace 2x dry well pumps, currently in use to de-water the deep locks and dry docks at HMNB Portsmouth.

The pumps are required to discharge saltwater at a minimum of 20,000 m3/h each at total dynamic heads of up to 20m.

The successful tenderer shall be responsible for the design, supply, installation and commissioning of the pump, motor, and controls.

The pumps shall require minimal alterations to the existing civil structure.

The existing pumps, motors and controls are to be removed and disposed of by the tenderer.

Budget: circa £5m Contractor SQEP (Suitably Qualified and Experienced Personnel) guidance Industry track record, confined space working, salt water environments, large and deep wells, working within MoD establishments.

NIC EIC approved (National Inspection Council for Electrical Installation Contracting), NACE accreditation, EN1090 execution class 3., Achillies UVDB, City & Guilds confined space level 2/3 for operatives, level 5 for managers, Welder quals to BS EN 287, Security clearance, IPAF (International Powered Access Federation), SMSTS (Site Management Safety Training Scheme), IOSH (Institution of Occupational Safety and Health), NEBOSH (National Examination Board in Occupational Safety and Health), CHAS (Contractors Health and Safety Assessment Scheme), Safe Contractor.

Key Dates (approximate) Expressions of Interest: 5 January 2024 ITT Published: Late January 2024 ITT Close: Mid/Late March 2024 Construction commencement: 01 May 2024 Project Completion : 30 June 2025

Key requirements

What the supplier must deliver

01

The Tenderer should be aware that

The Tenderer should be aware that the works detailed in this package are constrained due to the nature of the location they are to be conducted in.

02

The Contractor shall be expected to adhere

The Contractor shall be expected to adhere by the HMNB site security requirements, all Contractors and Sub-Contractors shall be BPSS security vetted and will be required to hold the relevant site security passes.

03

The Contractor shall be expected to hold

The Contractor shall be expected to hold the following levels of insurance £10m Public Liability, £10m Product Liability, £5m Professional Indemnity.

04

KBS Maritime are delivering an ambitious, modern

KBS Maritime are delivering an ambitious, modern and enduring change to the Portsmouth Naval base infrastructure, securing investment in the local community and ensuring fit-for-purpose, world-leading fleet support for the Royal Navy and the UK in the decades ahead.

05

The pumps are required to discharge saltwater

The pumps are required to discharge saltwater at a minimum of 20,000 m3/h each at total dynamic heads of up to 20m.

Derived from the notice text — always confirm against the original documents.

What this bid requires

Skills, tools & certifications

Detected from the notice — the capabilities and credentials this bid calls for. Click one to see who wins that work.

Buyer intelligence

Make the case to bid

Reveal who to approach at Ministry of Defence, and generate a go-to-market strategy from their news, accounts and people.

Source & provenance
OCID
27bc8609-7044-415f-968d-b9ea11ccf321
Stage
contract · Contract
Source
Contracts Finder
Buyer ref
tender_403080/1291129
View the original notice on Contracts Finder

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

Market context

Who wins this kind of work

The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.

Top suppliers & buyers in Industrial Machinery

Assembling the market network…

Ministry of Defence’s tender network

Assembling the network…

Also open now

Similar open tenders

EFRP - Train Lifting Jacks for New Enterprise Trains

Translink

Closes 17 Sept 2026Industrial Machinery
£1.2mValue

Supply of Robot Cleaning at The University Of Huddersfield

University of Huddersfield

Closes 14 Jul 2026Furniture & Furnishings
£90kValue