Thames Barrier Mirrlees Blackstone Engines Three-Quarter Life Survey
The three Mirrlees Blackstone engines (ESL16 twin bank engine) installed at Thames Barrier are fast approaching their anticipated three- quarter life survey .
The following inspections and component overhaul are proposed , in order to enable the engines to be suitable for a further 10-15-year period.
1.
Nodal Damper Coupling (NDC) fluid level check 2.
Gearbox bearing and final alignment verification 3.
Cylinder Liner Nose O-ring Renewal 4.
Liner deglazing and Piston Ring Pack replacement 5.
Cylinder Head Decarbonising and Pressure Test 6.
Jacket Water Pump.
7.
Standard Service Procedures Within procedures 1 - 6 carry out standard service work to include: - Recalibration of fuel injectors (does not include nozzle replacement) - Pressure testing of internal fuel system - Renewal of lube oil filter elements (engine) - Renewal of lube oil filter elements (gearbox) - Renewal of fuel filter elements - Re-setting of exhaust valve tappet clearances - Visual Inspection of internal pipework - Visual Inspection of camshaft assembly and drive gear train - Visual Inspect all coolers and heat exchangers for external leakages - Operational check and adjustment of mechanical overspeed - Operational check and adjustment of decompression system - Renewal of all crankcase and camshaft door joints - Check and record crankshaft deflections - Measure and record crankshaft end float - Operational check and adjustment of internal and external fuel rack linkage - Operational check of engine and gearbox lube oil pre-prime system 8.
Recalibration of on engine sensors 9.
Re-commissioning / load test The engineer/s working on the project must have in-depth knowledge of ESL 16 twin bank engines, with proven evidence of experience.
The successful supplier will provide spares when required, within a reasonable lead time.
The preferred supplier must be CTC (counter terrorist check) cleared prior to contract award.
What the supplier must deliver
The engineer/s working on the project must
The engineer/s working on the project must have in-depth knowledge of ESL 16 twin bank engines, with proven evidence of experience.
The successful supplier will provide spares when
The successful supplier will provide spares when required, within a reasonable lead time.
The preferred supplier must be CTC (counter
The preferred supplier must be CTC (counter terrorist check) cleared prior to contract award.
Derived from the notice text — always confirm against the original documents.
Skills, tools & certifications
Detected from the notice — the capabilities and credentials this bid calls for. Click one to see who wins that work.
Make the case to bid
Reveal who to approach at Defra Network eTendering Portal, and generate a go-to-market strategy from their news, accounts and people.
- OCID
- 2c3a0f24-3f12-433b-9d04-13142645ea04
- Stage
- preprocurement · Closed
- Source
- Contracts Finder
- Buyer ref
- tender_312173/1093739
Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.
Who wins this kind of work
The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.
Top suppliers & buyers in Engineering & Architecture
Assembling the market network…
Defra Network eTendering Portal’s tender network
Assembling the network…