3" Cryogenic Vent Stack with Changeable Terminations
The procurement contact named on the official notice.
All tender documents are available via the HSE In-Tend supplier e-procurement portal. All responses and requests for clarification must be submitted via the portal. Registration is free of charge and can be completed via the following link: https://in-tendhost.co.uk/hse
The submission route named on the official notice.
This sits below the typical range for Construction Materials & Structures contracts — a smaller, more accessible award. Based on 10,341 valued Construction Materials & Structures tenders in our corpus.
HSE require a 3" vent stack for use with cryogenic hydrogen for an experimental programme.
The vent must have interchangeable terminations (miter cut, bullhorn, lambda) which may be on a flanged connection or otherwise joined.
The vent stack should be 4 m tall and terminate in a 3" ANSI Class 300 flange.
0.5 m from the top there should be two bosses with ¼" BSP female fittings and another boss with a 7/16" UNJF female fitting.
The vent stack must have a maximum allowable working pressure of 40 barg.
The vent stack should have a manual drain valve at the bottom of the stack which is spring loaded (normally closed).
1.5 m from the bottom of the vent stack should be a 3" ANSI flange connection and a 1½" ANSI flange connection.
Both these flanges must be Class 300.
The vent should come with 3 interchangeable termination designs which are on 3" ANSI Class 300 flanges to attach to the top of the vent stack.
Suitable gaskets and torque values/calculations for all flanges should be provided.
See In-tend for full requirements
What the supplier must deliver
The vent must have interchangeable terminations (miter
The vent must have interchangeable terminations (miter cut, bullhorn, lambda) which may be on a flanged connection or otherwise joined.
The vent stack should be 4 m
The vent stack should be 4 m tall and terminate in a 3" ANSI Class 300 flange.
0.5 m from the top there should
0.5 m from the top there should be two bosses with ¼" BSP female fittings and another boss with a 7/16" UNJF female fitting.
The vent stack must have a maximum
The vent stack must have a maximum allowable working pressure of 40 barg.
The vent stack should have a manual
The vent stack should have a manual drain valve at the bottom of the stack which is spring loaded (normally closed).
Derived from the notice text — always confirm against the original documents.
Make the case to bid
Reveal who to approach at Health and Safety Executive, and generate a go-to-market strategy from their news, accounts and people.
The full intelligence dossier
Our agent reads Health and Safety Executive’s accounts, hunts live signals, finds the people who decide — and hands you a bid strategy plus a go-to-market influence plan, including what your team should post this week. You approve every paid step.
Ask me about this tender, the buyer, who wins their work, or whether you should bid.
- OCID
- ocds-h6vhtk-064e2b
- Stage
- tender · Open
- Source
- Find a Tender
- Buyer ref
- 012525-2026
Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.
Who wins this kind of work
The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.
Top suppliers & buyers in Construction Materials & Structures
Health and Safety Executive’s tender network
Assembling the network…