Balfour Beatty VINCI Systra JV
WP15 Final Highways Scope - Old Oak Common (S4) Station
This is a large award for Construction Materials & Structures — above three-quarters of comparable contracts. Based on 10,341 valued Construction Materials & Structures tenders in our corpus.
WP15 Final highways scope The OOC Lane realignment & Final highways scope package consists of: Removal of all existing highway surfacing and street furniture (is there any to be retained / relocated or does it include disposal?) Installation of any temporary critical highway furniture (e.g.
Street Lighting, Barriers) required to carry out the works Requirement to maintain a 2m wide footpath to be used by the public throughout the construction of the package, the subcontractor is to include the installation and maintenance of this public footpath, and relocation as required to suit the construction sequence.
The excavation of the existing highway down to final formation level, and any other necessary levels required to enable temporary works or sequencing All temporary works required for the construction of the works, including any access requirements Assessments to structures, utilities, properties, which may be affected by the works, as required to satisfy client, Contractor and/or 3rd parties requirements Removal and disposal of all current utilities in the highway.
Installation of OOC Lane footpath retention structures Installation of any other required Highway Civils Installation of all highway and foul drainage Installation of UKPN 132kV & 33kV duct routes, inclusive of any tunnel / subterranean system and the required temporary works The removal of any installed temporary works and the construction of the highway The installation of all highway furniture and its required infrastructure (traffic lights incl of ducting, islands, street lighting incl of ducting etc) Removal of temporary works installed by others to facilitate utility connections at the north and south end of the
What the supplier must deliver
Street Lighting, Barriers) required to carry out
Street Lighting, Barriers) required to carry out the works.
Requirement to maintain a 2m wide footpath
Requirement to maintain a 2m wide footpath to be used by the public throughout the construction of the package, the subcontractor is to include the installation and maintenance of this public footpath, and relocation as required to suit the construction sequence.
The excavation of the existing highway down
The excavation of the existing highway down to final formation level, and any other necessary levels required to enable temporary works or sequencing.
Assessments to structures, utilities, properties, which may
Assessments to structures, utilities, properties, which may be affected by the works, as required to satisfy client, Contractor and/or 3rd parties requirements.
Derived from the notice text — always confirm against the original documents.
Make the case to bid
Reveal who to approach at Balfour Beatty VINCI Systra JV, and generate a go-to-market strategy from their news, accounts and people.
- OCID
- 44b34daa-4df3-432a-8263-cf7c34fde72a
- Stage
- contract · Contract
- Source
- Contracts Finder
- Buyer ref
- C4N98553049
Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.
Who wins this kind of work
The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.
Top suppliers & buyers in Construction Materials & Structures
Assembling the market network…
Balfour Beatty VINCI Systra JV’s tender network
Assembling the network…