RFP QuestBeta
ClosedStage · contract

BMB Joint Venture (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty)

Thames Tideway Tunnel - C405 Main Works West - Permanent Formwork Decking

Construction MaterialsCPV 44000000 44100000 44110000 44114000 45000000 45200000 45220000 45223000 45260000 45262000
Value£43k
Deadline13 Nov 2020
Published12 Mar 2021
RegionLondon
Timeline
Published 12 Mar 2021ClosedCloses 13 Nov 2020
Contract value in context
£43ktotal contract value
median £135k
this tender£0£4.1m

This sits below the typical range for Construction Materials & Structures contracts — a smaller, more accessible award. Based on 10,341 valued Construction Materials & Structures tenders in our corpus.

Match for your company
Sign up free to see how well this tender matches your company — the score, the signals that align, and where the gaps are.
The brief

The Thames Tideway Tunnel project (the Project) will control CSO discharges by intercepting and diverting combined sewage flows into a new storage and transfer tunnel.

The main tunnel will run from Acton Storm Tanks in west London to Abbey Mills Pumping Station in the east, where it will connect to the Lee Tunnel, which will transfer the combined sewage to Beckton Sewage Treatment Works for treatment.

The Project extends from Acton Storm Tanks in west London, to Abbey Mills Pumping Station in east London.

The Project includes associated works at Beckton STW, Shad Thames Pumping Station and Bekesbourne Street.

The geographic layout of the Project and local authorities through which it passes is shown in Figure 1.

The Project comprises: a. tunnels: i. a main tunnel which will capture and store combined sewage from CSOs along its route and transfer it to Abbey Mills Pumping Station, from where the Lee Tunnel will transfer it for treatment at Beckton Sewage Treatment Works ii.

11 connection tunnels, which will link flows from CSOs to the main tunnel. b.

Worksites: i. five main tunnel Worksites (drive and/or reception sites) ii.

16 CSO Worksites iii. two System modification Worksites Thames Tideway Tunnel iv. works at Beckton Sewage Treatment works.

Section 4: Scope of Works Part 1) Scope of Supply Attenuation Tank:- BMB JV require fabrication and supply of permanent formwork for an Attenuation Tank at Hammersmith site.

Panels shall be made to the geometry displayed in the drawings provided for the Attenuation Tank.

All panels are to be laminated as the soffit will be submerged by BMB JV systematically.

Panels shall be delivered to site labelled in-order to allow BMB JV to install the panels in the correct sequence.

Supply of all ancillary items such as grout check and joint sealing tapes should be detailed and included in the supply.

All supporting documentation for a material compliance report should be provided prior to order delivery.

No openings are required as BMB JV will post cut on site.

Attenuation Tank Building Drawings 3320-AAJVX-HAMPS-540-SZ-DR-000040 3320-AAJVX-HAMPS-540-SZ-DR-000041 Part 2) Hammersmith Shaft Scope of Supply: - BMB JV require fabrication and supply of permanent formwork for a drop shaft at Hammersmith site.

The supplier is to conduct a design check on the panels proposed for permanent and temporary loadings and spans for the Hammersmith Shaft.

Supply of all ancillary items such as grout check and joint sealing tapes should be detailed and included in the supply.

Panels shall be delivered to site labelled in-order to allow BMB JV to install the panels in the correct sequence.

Supplier will produce manufacturing drawings for panel layout for BMB's approval.

All documentation to be supplied for panel layout to be checked by BMB temporary works department before commencement

Key requirements

What the supplier must deliver

01

Scope of Supply Attenuation Tank:-

Scope of Supply Attenuation Tank:-.

02

BMB JV require fabrication and supply

BMB JV require fabrication and supply of permanent formwork for an Attenuation Tank at Hammersmith site.

03

Panels shall be made to the geometry

Panels shall be made to the geometry displayed in the drawings provided for the Attenuation Tank.

04

Panels shall be delivered to site labelled

Panels shall be delivered to site labelled in-order to allow BMB JV to install the panels in the correct sequence.

05

Supply of all ancillary items such as

Supply of all ancillary items such as grout check and joint sealing tapes should be detailed and included in the supply.

Derived from the notice text — always confirm against the original documents.

Buyer intelligence

Make the case to bid

Reveal who to approach at BMB Joint Venture (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty), and generate a go-to-market strategy from their news, accounts and people.

Source & provenance
OCID
45069d1f-46f3-4df9-834e-56e40917a134
Stage
contract · Contract
Source
Contracts Finder
Buyer ref
C4A52134406
View the original notice on Contracts Finder

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

Market context

Who wins this kind of work

The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.

Top suppliers & buyers in Construction Materials & Structures

Assembling the market network…

BMB Joint Venture (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty)’s tender network

Assembling the network…

Also open now

Similar open tenders

Plant Room Replacement Works at Plas Bryn Extra Care, Cardiff

Codi Group Ltd

Closes 31 Jul 2026Construction
£180kValue

Provision of Temporary Structures at ReActon Circular Economy Hub for West London Waste Authority

West London Waste Authority

Closes 31 Jul 2026Construction
£400kValue