RFP QuestBeta
ClosedStage · contract

GO Shared Services

Invitation to Tender - Phase 2 - Lighting & Electrical Upgrades in Communal Areas

ConstructionCPV 45000000 45300000 31000000 31600000 31680000 31681000 51000000 51100000 45310000 45311000 71000000 71300000 71310000 71314000
Value£1.1m
Deadline1 Jul 2018
Published14 Jun 2018
RegionUK-wide
Timeline
Published 14 Jun 2018ClosedCloses 1 Jul 2018
Contract value in context
£1.1mtotal contract value
median £158k
this tender£0£6.5m

This is a large award for Construction — above three-quarters of comparable contracts. Based on 64,002 valued Construction tenders in our corpus.

Match for your company
Sign up free to see how well this tender matches your company — the score, the signals that align, and where the gaps are.
The brief

After carrying five yearly electrical inspections of all communal area electrical circuits, it has been found that a general wiring of the stock was old and with inconsistent wiring colours and regulatory works back to the 16th edition it has been decided to upgrade all the wiring The current wiring system is in 16mm metal conduit, buried in concrete which is usable but with upgrading, is unable to take anything bigger the 2.5mm single wiring.

It has been decided to use 25mm PVC white conduit internally in the building to create a new route for the wiring.

You will see by the testing certification that must of the Consumer units are of every type from BS3036 Re-wireble fuses to BS 60898 MCB.

The requirement is to standardise so all the buildings are the same.

But due to the complexity of the DNO system, only some buildings have consumer units and are feed using 2.5mm cabled looped through the loft space to feed the next building.

We have found that if we feed three blocks using the internal conduit the remaining block/s can be fed by an external conduit to the forth block to pick up a ground floor fitting and new internal PVC conduit and use the loft loop to feed the fifth block.

To bring the new wiring from the consumer unit to the internal light fittings, there is existing shallow trucking, but, the cams are worn, so you will need to open the lid to bring the wring to the light fitting and then fit the lid back by rivets There is also a requirement to replace all internal lights with the approved specify lights from ASD, our approved lighting provider.

This is to include upgrading the current spec from just amenity lighting to LED lighting with microwave lighting which is dimmable to 10% and in required locations 3 hour emergency lighting.

They have also provided lighting designs for the light locations A light is also required in the electrical cupboard which is also to be a 3 hour emergency light and you are to provide new tails from the meter to the consumer unit.

It has also been noted that the supplies to the door entry system will also be required to be replaced and to the first nearest high level (Approx 2.5 meters) external light using the existing conduit system.

Some light are above this or will require new conduit, this will be assessed by the contracts administrator and a variation raised.

As part of the existing system, most blocks have one external light at each entrance to the building, this are call low level external light and not to be confused with the high level external lighting.

These lights are to be replaced.

You will also be required to replace the existing photocell Sheltered housing accommodation Generally, this is to the general need accommodation standards, but some building has lifts, stair lifts and small power in communal areas.

You are to replace as above and to include the small power circuits which will have single MK Non-standard T Earth socket.

Currently...

Key requirements

What the supplier must deliver

01

You will see by the testing certification

You will see by the testing certification that must of the Consumer units are of every type from BS3036 Re-wireble fuses to BS 60898 MCB.

02

To bring the new wiring from

To bring the new wiring from the consumer unit to the internal light fittings, there is existing shallow trucking, but, the cams are worn, so you will need to open the lid to bring the wring to the light fitting and then fit the lid back by rivets.

03

A light is also required in

A light is also required in the electrical cupboard which is also to be a 3 hour emergency light and you are to provide new tails from the meter to the consumer unit.

04

It has also been noted that

It has also been noted that the supplies to the door entry system will also be required to be replaced and to the first nearest high level (Approx 2.5 meters) external light using the existing conduit system.

05

You will also be required to replace

You will also be required to replace the existing photocell.

Derived from the notice text — always confirm against the original documents.

Buyer intelligence

Make the case to bid

Reveal who to approach at GO Shared Services, and generate a go-to-market strategy from their news, accounts and people.

Source & provenance
OCID
485db83c-b8c3-45e5-909c-85a76b2e058d
Stage
contract · Contract
Source
Contracts Finder
Buyer ref
CBC0168P
View the original notice on Contracts Finder

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

Market context

Who wins this kind of work

The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.

Top suppliers & buyers in Construction

Assembling the market network…

GO Shared Services’s tender network

Assembling the network…

Also open now

Similar open tenders

CA18216 - R9309 Electrical Upgrade EGH Ph 2

Epsom & St Helier University Hospitals NHS Trust

Closes 31 Jul 2026Construction
£200kValue

IWM/2627/EPS/3505: Electrical Infrastructure Upgrade at IWM Duxford

Imperial War Museums

Closes 31 Jul 2026Construction
£2.1mValue