This sits in the lower-middle of the Construction band — a mid-scale opportunity. Based on 64,002 valued Construction tenders in our corpus.
Tenders are invited for the design, supply and installation of a 1.2m wide recycled plastic 6m long pedestrian bridge and 63lin m boardwalk together with foundations, handrails and all necessary fittings and fixings.
Tenderers are welcome to propose alternatives to the following specification based on their own expertise and experience but must describe any variation from it.
Specification Design Load: The bridge and boardwalk shall be designed for a live pedestrian load not less than 4kn/m2.
Material: The bridge and boardwalk shall be fabricated from recycled plastic components.
The colour shall be uniform black or dark grey.
Metal fixings shall be galvanised or stainless steel.
Bridge Access: On the west side, access to the bridge shall be via a short ramp from road level approx.
1.8 m wide with slope not exceeding 1 in 12 surfaced with bound gravel.
Bridge Foundations: It is envisaged that the bridge foundations will comprise lightly reinforced insitu concrete beams cast on top of 2No 200mm diameter recycled plastic piles 3m long but tenderers should describe their own proposals and note that design responsibility for fitness for purpose will rest with the contractor.
The west side foundation shall be higher than the east by 0.5m providing a 1:12 fall across the bridge.
Boardwalk Foundations shall be recycled plastic posts suitably bedded into the ground.
Bridge & Boardwalk shall be 1.2m wide.
There shall be a 4.5m long x 1.2m wide passing platform at midpoint of the boardwalk.
There shall be 1.2m wide ramps from boardwalk to ground with slope not exceeding 1 in 12 on either side at 7.5m from the east bridge abutment.
The bridge and first section of the boardwalk only - i.e.
7.5m to the ramps - shall have double handrail.
Kickboards should not be provided but bridge and boardwalk shall have wheelchair edge guides on both sides.
Layout of the bridge and boardwalk is indicated on the attached 2 sketches but subject to final agreement.
Applications will be received by email to clerk@chalfontstpeter-pc.gov.uk no later than 11am on Friday 16th August 2024.
What the supplier must deliver
Tenders are invited for the design, supply
Tenders are invited for the design, supply and installation of a 1.2m wide recycled plastic 6m long pedestrian bridge and 63lin m boardwalk together with foundations, handrails and all necessary fittings and fixings.
Tenderers are welcome to propose alternatives
Tenderers are welcome to propose alternatives to the following specification based on their own expertise and experience but must describe any variation from it.
Design Load: The bridge and boardwalk shall
Design Load: The bridge and boardwalk shall be designed for a live pedestrian load not less than 4kn/m2.
Material: The bridge and boardwalk shall
Material: The bridge and boardwalk shall be fabricated from recycled plastic components.
The colour shall be uniform black or
The colour shall be uniform black or dark grey.
Derived from the notice text — always confirm against the original documents.
Make the case to bid
Reveal who to approach at Chalfont St Peter Parish Council, and generate a go-to-market strategy from their news, accounts and people.
- OCID
- 5215f2f8-41d9-4eb4-a1d6-254456c28a9f
- Stage
- contract · Contract
- Source
- Contracts Finder
- Buyer ref
- CSP - Bridge and Boardwalk
Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.
Who wins this kind of work
The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.
Top suppliers & buyers in Construction
Assembling the market network…
Chalfont St Peter Parish Council’s tender network
Assembling the network…