GB-Edinburgh: Refurbishment and Upgrade of Slipways
This is a contract result notice, not an open opportunity. Details from the official award data.
This sits in the lower-middle of the Construction band — a mid-scale opportunity. Based on 64,002 valued Construction tenders in our corpus.
The Works Davaar (Campbeltown) The Boat landing at Davaar consists of a coursed rubble granite slipway (5m wide x 34m long x 0.9m average height), with dressed capping stones along the edges of the top surface.
The general condition is fair and the overall line and profile of the structure are straight and true.
However, a section of the top surface, towards the seaward end (approx.
10m x 3.4m), is showing signs of possible scour damage to the hearting material (i.e. open joints between interlocking stones and settlement of the deck surface).
Holy Island Inner (Arran) The Boat landing at Holy Island Inner consists of a South-West facing high water pier, with 4 No adjacent steps to the Southern aspect (to allow for low water landing).
The vertical elevations, top surface (with assumed random rubble fill) and steps have been overlain in mass concrete.
The structure has been patch repaired with mass concrete at various times in the past.
The top surface of the pier is generally in fair serviceable condition, with localised spalling and potholes towards the Lighthouse end.
The main sea-ward elevation and the North and South elevations are in poor condition, with extensive loss of concrete and scour damage at the seabed level.
The surfaces of the low water landing steps are also significantly eroded.
Fladda (Slate Islands) These works are not currently included for pricing but will be additional work awarded on successful completion at the first two sites.
Boat landing at Fladda is on the north side of the island and extends 45m into the sea.
Areas that have been washed out will require to be refilled with concrete bagwork with elevations reformed and surfaces restored using local slate to match the existing.
This project is similar to Holy Island.
More detail of the works will be available on completion of a full survey which has not been completed to date.
For detailed description of the works refer to the Bill of Quantities.
Site visits are planned on 31 August and 1 September 2020.
Should the weather conditions be a problem and alternative date will be arranged with all interested parties
What the supplier must deliver
Areas that have been washed out
Areas that have been washed out will require to be refilled with concrete bagwork with elevations reformed and surfaces restored using local slate to match the existing.
Should the weather conditions be a problem
Should the weather conditions be a problem and alternative date will be arranged with all interested parties.
Derived from the notice text — always confirm against the original documents.
Make the case to bid
Reveal who to approach at Northern Lighthouse Board, and generate a go-to-market strategy from their news, accounts and people.
Ask me about this tender, the buyer, who wins their work, or whether you should bid.
- OCID
- 6596923e-837f-4c69-81b3-a8921a185f03
- Stage
- contract · Contract
- Source
- Contracts Finder
- Buyer ref
- BIP623728601
Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.
Who wins this kind of work
The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.
Top suppliers & buyers in Construction
Northern Lighthouse Board’s tender network
Assembling the network…