WELLSPRING ACADEMY TRUST

RENEWAL OF SINGLE PIPE HEATING SYSTEM AT THE FOREST ACADEMY

EnergyCPV 09300000 44160000 51120000
ValueValue not published
Deadline28 May 2019
Published29 May 2019
RegionNationwide
Timeline
Published 29 May 2019ClosedCloses 28 May 2019
Match for your company
Sign up free to see how well this tender matches your company — the score, the signals that align, and where the gaps are.
The brief

The works generally include for the removal of the existing single pipe heating system pipework with all old column style radiators whilst retaining the newer panel radiators and re-piping in a standard twin pipe flow and return distribution system.

The works shall include the removal of redundant services including existing radiators and interconnecting LTHW pipework, valves and fittings and with an option of replacing the existing circulation pumps.

The Boilers and boiler house systems and all gas, hot and cold water distribution pipework, plant and equipment, taps, valves and fittings etc. throughout the existing buildings are to remain as built.

The works shall comprise the supply, installation, setting to work and testing & commissioning of new radiators and pipe coils in the existing building supplied by new heating pipework.

An option for the supply, installation, setting to work and testing & commissioning of two no. new LTHW circulation pumps in the existing boiler house shall be allowed for.

The works shall allow for the provision of low temperature radiators as noted on the schedules and drawings in the Accessible Bathrooms and the Reception and Early Years classroom wing and include for the boxing in of all pipework below ceiling level down walls and along floors in these areas only.

Some radiators and or existing boxing may be retained and re-used as indicated on the drawings.

The works shall include for all buildersworks in connection, including making good, filling in all buildersworks openings, modification of ceilings to allow installation of pipework, provision of fire stopping, re-painting and re-plastering as required.

The building Services which include Mechanical and Electrical elements of design, shall be carried out in a Professional manner by Qualified Engineers.

The Building Services are to be integrated into the buildings to enable a safe and comfortable environment to be achieved.

The contractor is to employ sub-contractors to carry out the electrical and builders work associated with this contract and in accordance with this specification.

The works to be undertaken shall comply with all the Mechanical and Electrical Specifications issued.

All Current Statutory Regulations Approved Standards and Codes of Practice.

This includes Fire Regulations with the local Officers Requirements, Health and Safety Regulations, Electricity at Work Regulations, Water Regulations and Building Regulations.

The works shall include all testing and documentation.

The design shall be based on Technical Design Practice described in the latest edition of the Wiring Regulations for Electrical Installations by the Institute of Electrical Engineers and Design Guides by Chartered Institute of Building Services Engineers.

The Electrical Installation shall be carried out by an Electrical Contractor who is a member of the NICEIC (National Inspection Council for Electrical Installation Contracting).

All materials and workmanship shall be i

Key requirements

What the supplier must deliver

01

The works shall include the removal

The works shall include the removal of redundant services including existing radiators and interconnecting LTHW pipework, valves and fittings and with an option of replacing the existing circulation pumps.

02

The works shall comprise the supply, installation

The works shall comprise the supply, installation, setting to work and testing & commissioning of new radiators and pipe coils in the existing building supplied by new heating pipework.

03

An option for the supply, installation, setting

An option for the supply, installation, setting to work and testing & commissioning of two no. new LTHW circulation pumps in the existing boiler house shall be allowed for.

04

The works shall allow for the provision

The works shall allow for the provision of low temperature radiators as noted on the schedules and drawings in the Accessible Bathrooms and the Reception and Early Years classroom wing and include for the boxing in of all pipework below ceiling level down walls and along floors in these areas only.

05

The works shall include for all buildersworks

The works shall include for all buildersworks in connection, including making good, filling in all buildersworks openings, modification of ceilings to allow installation of pipework, provision of fire stopping, re-painting and re-plastering as required.

Derived from the notice text — always confirm against the original documents.

Buyer intelligence

Make the case to bid

Reveal who to approach at WELLSPRING ACADEMY TRUST, and generate a go-to-market strategy from their news, accounts and people.

Source & provenance
OCID
6f5dceb7-2c81-4dec-ada5-ed0735236ac1
Stage
contract · Contract
Source
Contracts Finder
Buyer ref
WAT100519
View the original notice on Contracts Finder

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

Market context

Who wins this kind of work

The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.

Top suppliers & buyers in Petroleum, Fuel & Energy Products

Assembling the market network…

WELLSPRING ACADEMY TRUST’s tender network

Assembling the network…

Also open now

Similar open tenders

Biomass Heating Systems - Supply of Fuel Pellets

Argyll and Bute Council

Closes 30 Jul 2026Energy
Value not publishedValue

Dynamic Purchasing System - Standalone Renewable Energy Assets

ANGLIAN WATER SERVICES LIMITED

Closes 30 Oct 2028Energy
Value not publishedValue