BALFOUR BEATTY CIVIL ENGINEERING LIMITED
A66 - BOQ Production
The appointed Professional Quantity Surveyor (PQS) will be responsible for producing accurate quantity take-offs and Bills of Quantities (BoQs) for the highways project in compliance with client standards, including the Manual of Contract Documents for Highway Works and NEC PSC requirements.
The PQS will extract material quantities from federated BIM models and associated drawings, validate these against design intent, and prepare structured BoQs aligned with the agreed Work Breakdown Structure.
Deliverables must be provided in a format compatible with cost control and procurement systems, maintaining a clear audit trail throughout.
Inputs such as design specifications, federated models, and programme details will be supplied by the project team, while the PQS will ensure consistency across packages, avoid duplication, and incorporate scope splits for subcontract works.
The engagement excludes any design or site activities and requires adherence to project-specific quality standards and assurance requirements.
Outputs must meet accuracy and compliance criteria, support procurement timelines, and interface effectively with estimating, procurement, and engineering teams to enable timely and cost-effective delivery
What the supplier must deliver
The appointed Professional Quantity Surveyor (PQS)
The appointed Professional Quantity Surveyor (PQS) will be responsible for producing accurate quantity take-offs and Bills of Quantities (BoQs) for the highways project in compliance with client standards, including the Manual of Contract Documents for Highway Works and NEC PSC requirements.
Deliverables must be provided in a format
Deliverables must be provided in a format compatible with cost control and procurement systems, maintaining a clear audit trail throughout.
Inputs such as design specifications, federated models
Inputs such as design specifications, federated models, and programme details will be supplied by the project team, while the PQS will ensure consistency across packages, avoid duplication, and incorporate scope splits for subcontract works.
Outputs must meet accuracy and compliance criteria
Outputs must meet accuracy and compliance criteria, support procurement timelines, and interface effectively with estimating, procurement, and engineering teams to enable timely and cost-effective delivery.
Derived from the notice text — always confirm against the original documents.
Make the case to bid
Reveal who to approach at BALFOUR BEATTY CIVIL ENGINEERING LIMITED, and generate a go-to-market strategy from their news, accounts and people.
- OCID
- 8212d6c9-5be7-4336-8ede-dde8cf44dc6a
- Stage
- contract · Contract
- Source
- Contracts Finder
- Buyer ref
- A66 - BOQ Production
Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.
Who wins this kind of work
The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.
Top suppliers & buyers in Engineering & Architecture
Assembling the market network…
BALFOUR BEATTY CIVIL ENGINEERING LIMITED’s tender network
Assembling the network…