Balfour Beatty VINCI Systra JV

Fit Out - Primary Steel Framework, Steel Sub Frames, Cladding Track, Firestops, Insulation, Retail Doors and Glazing -WP12.4.1 - Old Oak Common (S4) Station

ConstructionCPV 45000000 45200000 45260000 45262000 45400000 45440000 45220000 45223000 39000000 39200000 39290000 39299000
Value£10.0m
Deadline21 Feb 2025
Published7 Feb 2025
RegionLondon
Timeline
Published 7 Feb 2025ClosedCloses 21 Feb 2025
Contract value in context
£10.0mtotal contract value
median £158k
this tender£0£10.8m

This is a large award for Construction — above three-quarters of comparable contracts. Based on 64,002 valued Construction tenders in our corpus.

Match for your company
Sign up free to see how well this tender matches your company — the score, the signals that align, and where the gaps are.
The brief

WP12.4.1 - Installation of primary steel framework, installation of steel sub frames, cladding tracking systems, firestops, insulation, retail doors and glazing panels for retail units within the station SAB areas.

1.1.1.1 Scope: For a Subcontractor to fabricate, manufacture, and install fibre cement cladding, internal glazing and smoke downstands, and all internal structural steelwork to support the internal cladding and glazing scope to front of house and station concourse areas.

The scope also to include overclad doors, skirtings trims and architectural finished louvres.

Note the HS2 station internal artwork cladding panels provided by others.

1.1.1.2 The Contractor will issue a detailed design for pricing as part of the Invitation to Tender.

The Subcontractor will develop the design and coordinate the interfaces of the works, ensuring it is compliant and accepted by the Project Manager prior to commencement of works.

1.1.1.3 It's anticipated the site works will commence in mid 2027 and are likely to finish end of 2030.

Key materials for the Subcontractor to fabricate, manufacture and install: 1.1.1.4 Bespoke designed steel frame curtain walling system with fixed units, steel frame curtain walling system with single glazed fixed panels - 172m2.

1.1.1.5 Bespoke fabricated single glazed stick façade system, steel frame curtain walling system with clear faced single glazed units; glazed framed doors and opaque bulkhead infill panels - 577m2.

1.1.1.6 overall size 2000 x 2500mm high; double leaf doors - 10No.

1.1.1.7 Fire stops to the ceiling level - Approximately 720m.

1.1.1.8 Bespoke designed internal steel frame system, with fire rating and acoustic requirements incorporating a combination of clear and back painted fixed single-glazed units - 466m2.

1.1.1.9 Bespoke fabricated double-glazed system with insulated panels steel frame system with glazed facade system; double glazed fixed panels - 171m2.

1.1.1.10 Bespoke fabricated double-glazed system, steel frame system with glazed facade system; double glazed fixed panels - 97m2.

1.1.1.11 Fibre cement cladding lining with stainless steel trims and stainless-steel portal frame, supported by bracketry and rails which shall be fixed back to the vertical posts - 424m2.

1.1.1.12 Metal Cladding Lining, steel panels to form a rainscreen system shall be supported by bracketry and rails, including supply and install of vertical posts - 1353m2.

1.1.1.13 Installation of approximately 760m of ceiling firestopping.

1.1.1.14 Installation of 35No double leaf doors, fixings, door jambs and headers.

1.1.1.15 Installation of louvers, glazing manifestations, skirting, roller blinds, concertina smoke screen and down stands.

NOTE: LIN-271 is the vitreous enamel art cladding panels, this does not form part of this scope.

Further details can be found on the attached document

Key requirements

What the supplier must deliver

01

1.1.1.1 Scope: For a Subcontractor to fabricate

1.1.1.1 Scope: For a Subcontractor to fabricate, manufacture, and install fibre cement cladding, internal glazing and smoke downstands, and all internal structural steelwork to support the internal cladding and glazing scope to front of house and station concourse areas.

02

1.1.1.11 Fibre cement cladding lining with stainless

1.1.1.11 Fibre cement cladding lining with stainless steel trims and stainless-steel portal frame, supported by bracketry and rails which shall be fixed back to the vertical posts.

03

1.1.1.12 Metal Cladding Lining, steel panels

1.1.1.12 Metal Cladding Lining, steel panels to form a rainscreen system shall be supported by bracketry and rails, including supply and install of vertical posts.

Derived from the notice text — always confirm against the original documents.

Buyer intelligence

Make the case to bid

Reveal who to approach at Balfour Beatty VINCI Systra JV, and generate a go-to-market strategy from their news, accounts and people.

Source & provenance
OCID
86b23a2a-e291-4791-aba5-3e7ff942bcfd
Stage
contract · Contract
Source
Contracts Finder
Buyer ref
C4N90178587
View the original notice on Contracts Finder

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

Market context

Who wins this kind of work

The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.

Top suppliers & buyers in Construction

Assembling the market network…

Balfour Beatty VINCI Systra JV’s tender network

Assembling the network…

Also open now

Similar open tenders

Old Oak Private Sector Partner Procurement

The Old Oak and Park Royal Development Corporation (OPDC)

Closes 21 Jul 2026Construction
Value not publishedValue

e-ITT for the for the Establishment of a Multi-Contractor Framework Agreement (2026-30) for Minor Works related to Residential Housing for New Forest District Council (Housing Maintenance)

New Forest District Council

Closes 23 Jul 2026Construction
Value not publishedValue