HMPS New Hall - Fire Safety Improvements (FSI) BPRN: 3228
This is a contract result notice, not an open opportunity. Details from the official award data.
This is a large award for Construction — above three-quarters of comparable contracts. Based on 64,002 valued Construction tenders in our corpus.
To provide fit for purpose fire safety systems that comply with current statutory legislation within the built environment and adhere to the requirements set out in the latest CPFIG report and meets current MoJ technical standards. - Improve site wide notification of a fire in a cell within a dormitory block, with new detectors that are fully addressable onto the establishments' site wide fire alarm system. - Reduce the risk of further consequences following a fire related incident. - Reduce reactive maintenance in terms of time taken to maintain and repair the current system and associated costs. - Improve the long-term reliability of the fire alarm systems along with obtaining warranties for the all-new installations. - Provide a single system type through the establishment, thus reducing the requirement for commissioning two separate maintenance contractors. - Reduce complications caused during periodic inspection and test by operating over one system type. - Contribute to MOJ's sustainability targets by upgrading the existing lighting to improve performance, reduce operating costs and improve reliability of lighting in accommodation areas.
A constructor has been appointed for the design and build of the project.
This is a two stage Design and Build Contract let under the PPC2000 (Amended 2013) Form of contract.
The original estimated value of the contract was calculated by MOJ, and its Cost Consultants following desktop and non-intrusive surveys and was based on information reasonably known at the time and arrived at via a thorough and appropriate methodology.
The first stage will involve the constructor providing Pre-construction surveys and design services at a cost of £2,428,882.72.
It is expected that the total construction cost of the project will be c£24.5m.
What the supplier must deliver
To provide fit for purpose fire safety
To provide fit for purpose fire safety systems that comply with current statutory legislation within the built environment and adhere to the requirements set out in the latest CPFIG report and meets current MoJ technical standards.
Reduce reactive maintenance in terms of time
Reduce reactive maintenance in terms of time taken to maintain and repair the current system and associated costs.
Provide a single system type through
Provide a single system type through the establishment, thus reducing the requirement for commissioning two separate maintenance contractors.
Derived from the notice text — always confirm against the original documents.
Make the case to bid
Reveal who to approach at Ministry of Justice, and generate a go-to-market strategy from their news, accounts and people.
Ask me about this tender, the buyer, who wins their work, or whether you should bid.
- OCID
- 907d4ea9-a9aa-4ec9-a3cc-f37aeb31f8e5
- Stage
- contract · Contract
- Source
- Contracts Finder
- Buyer ref
- tender_381465/1434148
Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.
Who wins this kind of work
The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.
Top suppliers & buyers in Construction
Ministry of Justice’s tender network
Assembling the network…