RFP QuestBeta
Awarded · ResultStage · contract

National Highways

621600 - Western IC entry slip road pavement - construction phase support

ConstructionCPV 45000000 45200000 45230000 45233000
Value£231k
Awarded3 Jun 2025
Published16 Oct 2025
RegionNorth East
Outcome — awarded

This is a contract result notice, not an open opportunity. Details from the official award data.

Contract value in context
£231ktotal contract value
median £158k
this tender£0£6.5m

This sits in the upper-middle of the Construction band — a substantial contract for the sector. Based on 64,002 valued Construction tenders in our corpus.

The brief

A63 Western IC EB Entry Slip Road - 2000A63/443 (0.755km long) This is a single lane slip road which leads off the A15 SB.

Records indicate this slip road was resurfaced in 2016 with some previous deeper targeted inlays completed in 2008.

The current defects include surface course deterioration, joint deterioration and cracking.

Some defects are present in the local authority owned section, 10m prior to the start of the slip road - the scheme has been extended to incorporate these defects.

There are currently no concerns with regards to texture however, between Ch.0m and 150m SCRIM is as low as -.005.

There are two isolated areas of rutting at 11.5mm and TSD Cat 3 has been recorded between Ch.0m and 150m.

Deflectograph data is not currently available.

Wholescale inlays of 90mm deep are proposed for the entire length of the slip road.

This approach acknowledges the core findings and Cat 3 TSD readings however, there are no significant structural failures and this depth is deemed appropriate given the visual defects.

The only other option would be to go much deeper (full depth reconstruction) and the low traffic figures and type of defects do not justify this.

The chevron area between the slip road and mainline is to be resurfaced.

The existing drainage channels are to be replaced as they are life-expired and difficult to maintain.

It should be noted that slot drainage now requires a departure from standards, refer to Appendix G for alternative drainage system to be used.

Additional information/survey data to be passed onto the Detail Designer as soon as it becomes available.

The full extents of the slip road should be renewed - extend into lane 1 (full width) if necessary to ensure the narrow end is fully renewed.

There are no structures affected by this scheme.

Loops have not been identified within the scheme extent

Key requirements

What the supplier must deliver

01

The existing drainage channels are to

The existing drainage channels are to be replaced as they are life-expired and difficult to maintain.

02

It should be noted that slot drainage

It should be noted that slot drainage now requires a departure from standards, refer to Appendix G for alternative drainage system to be used.

03

The full extents of the slip road

The full extents of the slip road should be renewed.

04

Extend into lane 1 (full width) if

extend into lane 1 (full width) if necessary to ensure the narrow end is fully renewed.

Derived from the notice text — always confirm against the original documents.

Buyer intelligence

Make the case to bid

Reveal who to approach at National Highways, and generate a go-to-market strategy from their news, accounts and people.

Source & provenance
OCID
9693df03-16b1-476f-8386-44752fbbf253
Stage
contract · Contract
Source
Contracts Finder
Buyer ref
tender_509303/1524945
View the original notice on Contracts Finder

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

Market context

Who wins this kind of work

The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.

Top suppliers & buyers in Construction

Scroll to explore the market network

National Highways’s tender network

Assembling the network…

Also open now

Similar open tenders

Gremista Landfill, Lerwick, Shetland - Phase 3 Construction

Shetland Islands Council

Closes 19 Aug 2026Construction
Value not publishedValue

Tender for Phase 1 River Restoration Works on Ballymartrim River supported by PEACEPLUS CALM

Armagh City, Banbridge and Craigavon Borough Council

Closes 30 Jul 2026Agriculture & Forestry
£102kValue