RFP QuestBeta
ClosedStage · contract

BMB Joint Venture (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty)

Thames Tideway Tunnel - C405 Main Works West - Carnwath Road Pit Bottom Steel Alterations

ConstructionCPV 45262670
Value£650k
Deadline10 Jul 2020
Published5 Jul 2021
RegionLondon
Timeline
Published 5 Jul 2021ClosedCloses 10 Jul 2020
Contract value in context
£650ktotal contract value
median £158k
this tender£0£6.5m

This sits in the upper-middle of the Construction band — a substantial contract for the sector. Based on 64,002 valued Construction tenders in our corpus.

Match for your company
Sign up free to see how well this tender matches your company — the score, the signals that align, and where the gaps are.
The brief

The Thames Tideway Tunnel project (the Project) will control CSO discharges by intercepting and diverting combined sewage flows into a new storage and transfer tunnel.

The main tunnel will run from Acton Storm Tanks in west London to Abbey Mills Pumping Station in the east, where it will connect to the Lee Tunnel, which will transfer the combined sewage to Beckton Sewage Treatment Works for treatment.

The Project extends from Acton Storm Tanks in west London, to Abbey Mills Pumping Station in east London.

The Project includes associated works at Beckton STW, Shad Thames Pumping Station and Bekesbourne Street.

The geographic layout of the Project and local authorities through which it passes is shown in Figure 1.

The Project comprises: a. tunnels: i. a main tunnel which will capture and store combined sewage from CSOs along its route and transfer it to Abbey Mills Pumping Station, from where the Lee Tunnel will transfer it for treatment at Beckton Sewage Treatment Works ii.

11 connection tunnels, which will link flows from CSOs to the main tunnel. b.

Worksites: i. five main tunnel Worksites (drive and/or reception sites) ii.

16 CSO Worksites iii. two System modification Worksites Thames Tideway Tunnel iv. works at Beckton Sewage Treatment works.

Scope of Works BMB JV requires a subcontractor to supply and install up to eight pit bottom decks that will be used to hold equipment required for the secondary lining of the main tunnel.

All modules will be assembled by the subcontractor at the Carnwath Road main site in an assigned working area.

The subcontractor will need to make allowance for working amongst others.

BMB will lift the modules into the shaft with supervision and assistance of the subcontractor.

The Subcontractor will then install each module into its required position at the bottom of the shaft.

All personnel must be EPIC on-boarded as per Tideway induction procedure and have completed an on site-specific induction.

BMB will provide access to the shaft bottom.

All programme dates are subject to change: Delivery of steel required for assembly of modules 1-4 by 14 Sept 2020.

Installation for modules 5 and 6 begins in the shaft mid July 2021.

Installation for modules 7 and 8 will be based on the production of the secondary lining the earliest being late 2021 and latest March 2022.

Returned quotations will be evaluated by BMB JV's (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty) Procurement team in conjunction with our design and engineering teams.

Quotations will be evaluated based on; Cost Timeliness of return Adherence to and demonstration of understanding of the drawings and specifications provided at this point.

Provision of accurate product specifications to accompany the quotation.

Supplier experience of similar projects,evidence of this will be requested should the initial quotation be of interest.

Should the candidate supplier be shortlisted they will then be contacted directly by a member of the BMB Procurement Team within two weeks of shortlisting to discuss the requirement in detail.

BMB Joint Venture (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty) BMB-JV Tideway West, Carnwath Road Riverside, Carnwath Road, London Borough of Hammersmith & Fulham, SW6 3HR

Key requirements

What the supplier must deliver

01

BMB JV requires a subcontractor to supply

BMB JV requires a subcontractor to supply and install up to eight pit bottom decks that will be used to hold equipment required for the secondary lining of the main tunnel.

02

The subcontractor will need to make allowance

The subcontractor will need to make allowance for working amongst others.

03

All personnel must be EPIC on-boarded as

All personnel must be EPIC on-boarded as per Tideway induction procedure and have completed an on site-specific induction.

04

BMB will provide access to the shaft

BMB will provide access to the shaft bottom.

05

Adherence to and demonstration of understanding

Adherence to and demonstration of understanding of the drawings and specifications provided at this point.

Derived from the notice text — always confirm against the original documents.

Buyer intelligence

Make the case to bid

Reveal who to approach at BMB Joint Venture (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty), and generate a go-to-market strategy from their news, accounts and people.

Source & provenance
OCID
9a37c6fa-e798-472e-8548-46d1e28d2e07
Stage
contract · Contract
Source
Contracts Finder
Buyer ref
C4A49924594
View the original notice on Contracts Finder

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

Market context

Who wins this kind of work

The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.

Top suppliers & buyers in Construction

Assembling the market network…

BMB Joint Venture (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty)’s tender network

Assembling the network…

Also open now

Similar open tenders

Ravensbury Main Works Phase 3A and 3B Option PSQ

Clarion Regeneration Limited

Closes 29 Jul 2026Construction
£14.5mValue

External Works Package at a Residential Dwelling, North Leigh, Witney

West Oxfordshire District Council

Closes 24 Jul 2026Construction
£35kValue