RFP QuestBeta
ClosedStage · contract

BALFOUR BEATTY CIVIL ENGINEERING LIMITED

A57 Reinforced Earth Abutments (DESIGN ONLY )

Engineering & ArchitectureCPV 71000000 71300000
ValueValue not published
Deadline7 Aug 2025
Published24 Jul 2025
RegionNorth East
Timeline
Published 24 Jul 2025ClosedCloses 7 Aug 2025
Match for your company
Sign up free to see how well this tender matches your company — the score, the signals that align, and where the gaps are.
The brief

Description of the subcontract works 1) Reinforced soil abutment TWs design required to support temporary bridge over A57 - see previous TWs drawing 0002 Rev C3 attached for solution similar to this we are looking to complete.

2) A57 TWs loadings as per PDF annotated drawing attached "A57 Mottram - Temporary Bridge Reinforced Abutment LOADS Rev 1" 3) Main loads to note are: i.

RC bankseat located on top of reinforced soil abutment - see TWs drawing 0011 Rev P1 attached from other scheme for 70m clear span temporary bridge, assume RC bankseat 1m deep subject to TWs detailed design ii.

Assume PLAN area RC bankseat = 10m (transversally across temporary bridge) x 2m (along long length temporary bridge) = 20m2 iii.

MAX GBP, Z vertical @ 110kN/m2 iv.

MAX horizonal load, X @ 726kN 4) Temporary bridge to have 6.00m headroom clearance to soffit bridge deck with deflection from existing carriageway level 5) Reinforced soil abutment height = 1m buried below egl + 5m above egl + 0.4m temporary bridge deflection (assumed) = 6.4m height 6) 1m road side face reinforced soil abutment to face RC bankseat 7) 2m non-road side face (not approach ramp side) to face RC bankseat 8) Reinforced soil abutment faces to be vertical or nearly 9) PLAN area main block reinforced soil abutments = 14m (East to West) x 8m (North to South), distance to required geogrid tail length 10) TWs design life < 2 years 11) Reinforced soil abutment fill 6F5 quarried material (preferable) 12) Price to include TWs design and materials supply ONLY 13) Suggested installers information to be passed on for BB to contact to discuss installation 14) Price to also include for: i.

AIP TWs input for temporary bridge reinforced soil abutments element ii.

AIP DRN comments reply support to temporary bridge reinforced soil abutments element iii.

AIP Certificate review and signature (CEng MICE signature required) iv.

GDR input v.

TWs design calculations - provision of these on completion of TWs design vi.

TWs CAT 3 Check comment support to temporary bridge reinforced soil abutments element vii.

Site visits = allow 2No

Key requirements

What the supplier must deliver

01

1) Reinforced soil abutment TWs design required

1) Reinforced soil abutment TWs design required to support temporary bridge over A57.

02

12) Price to include TWs design

12) Price to include TWs design and materials supply ONLY.

03

AIP DRN comments reply support to temporary

AIP DRN comments reply support to temporary bridge reinforced soil abutments element.

04

TWs CAT 3 Check comment support

TWs CAT 3 Check comment support to temporary bridge reinforced soil abutments element.

Derived from the notice text — always confirm against the original documents.

Buyer intelligence

Make the case to bid

Reveal who to approach at BALFOUR BEATTY CIVIL ENGINEERING LIMITED, and generate a go-to-market strategy from their news, accounts and people.

Source & provenance
OCID
a1f17902-3859-4f21-b064-2ce1af6f4315
Stage
contract · Contract
Source
Contracts Finder
Buyer ref
A57 Reinforced Earth Abutments (DESIGN ONLY )
View the original notice on Contracts Finder

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

Market context

Who wins this kind of work

The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.

Top suppliers & buyers in Engineering & Architecture

Assembling the market network…

BALFOUR BEATTY CIVIL ENGINEERING LIMITED’s tender network

Assembling the network…

Also open now

Similar open tenders

Ysgol Eirias Development, Colwyn Bay, Conwy - Multi Disciplinary Design Team

Conwy County Borough Council

Closes 23 Jul 2026Engineering & Architecture
£300kValue

CA18178 - RFQ - Architectural / Principal Designer Services

Epsom &amp; St Helier University Hospitals NHS Trust

Closes 13 Jul 2026Engineering & Architecture
£30kValue