Cheshire Constabulary on behalf of the Police and Crime Commissioner for Cheshire
Internal Refurbishment at Congleton and Macclesfield Police Station
Congleton and Macclesfield Police Station - Minor Refurbishment of select areas of both locations.
The work involves internal refurbishment to two operational police stations, to refresh circulation areas, some office space together with the refurbishment of the toilet and shower facilities.
The work involves removal and replacement of existing suspended ceilings (working in conjunction with our electrical contractor who will install new lighting), redecoration to walls and woodwork and soft flooring.
Additionally, the refurbishment of the toilet facilities and shower pods including stripping out existing fittings and the installation of new sanitary fittings and wall coverings, decoration and soft flooring.
Note that electrical installation will be by others.
Contractors need to demonstrate that they have the necessary resources to enable them to complete the works in the timetable required.
Contractors will be required to submit staff details to undergo Police vetting and have vetting clearance prior to work being able to commence on site.
Building works is estimated to take 6 weeks per station to complete.
Works should commence no later than mid-September 2023 and be completed by 31st December 2023.
There will be a site visit opportunity on Monday 10th July 2023.
Details of the booking arrangements will be added to the ITT on a broadcast basis and MUST be prebooked.
This is an online ITT and bidders will need to open and work through the questionnaire which is the ITT as well as access the files in the documents folder.
What the supplier must deliver
Contractors need to demonstrate that they have
Contractors need to demonstrate that they have the necessary resources to enable them to complete the works in the timetable required.
Contractors will be required to submit staff
Contractors will be required to submit staff details to undergo Police vetting and have vetting clearance prior to work being able to commence on site.
Works should commence no later than mid-September
Works should commence no later than mid-September 2023 and be completed by 31st December 2023.
Details of the booking arrangements will
Details of the booking arrangements will be added to the ITT on a broadcast basis and MUST be prebooked.
This is an online ITT and bidders
This is an online ITT and bidders will need to open and work through the questionnaire which is the ITT as well as access the files in the documents folder.
Derived from the notice text — always confirm against the original documents.
Make the case to bid
Reveal who to approach at Cheshire Constabulary on behalf of the Police and Crime Commissioner for Cheshire, and generate a go-to-market strategy from their news, accounts and people.
- OCID
- a40b6d77-b1c3-4c84-b277-27a408217251
- Stage
- contract · Contract
- Source
- Contracts Finder
- Buyer ref
- 20230628160925-33132
Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.
Who wins this kind of work
The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.
Top suppliers & buyers in Construction
Assembling the market network…
Cheshire Constabulary on behalf of the Police and Crime Commissioner for Cheshire’s tender network
Assembling the network…