Skanska Costain STRABAG Joint Venture (SCS JV)

HS2 Main Works S1 & S2 - WP171 SCL Formwork

ConstructionCPV 45221247 45223210 43123000 44114200 45223500 45262300 44114000 45262310 14622000
Value£286k
Deadline19 Oct 2021
Published17 Oct 2022
RegionLondon
Timeline
Published 17 Oct 2022ClosedCloses 19 Oct 2021
Contract value in context
£286ktotal contract value
median £158k
this tender£0£6.5m

This sits in the upper-middle of the Construction band — a substantial contract for the sector. Based on 64,002 valued Construction tenders in our corpus.

Match for your company
Sign up free to see how well this tender matches your company — the score, the signals that align, and where the gaps are.
The brief

The scope for this package is the supply of SCL Formworks.

SCS require lining shutters to construct cast insitu concrete tunnel secondary linings.

The works will include: *Technical design *Design to British or European Standards. *Provision of calculations and drawings, including design of all temporary loads such as concrete pressure and uplift/floatation without penetrations through the shutter or waterproof membrane. *Provision of erection sequence /shop drawings *Manufacture and delivery of formwork to SCS jobsites, at multiple locations along the HS2 S1 and S2 contract. *Initial assembly of the system in the tunnel. *Buy-back of the system.

The works are split in to 3no. separate packages: 1) Cross Passages a.

Access limited to cross passage by openings in the TBM running tunnel of 2.850 x 1.900m b.

Secondary lining invert will have previously been cast flat. c.

Secondary lining thickness of ~250mm. d.

Shutter internal dimensions ~2.7m high x 3.3m wide. e.

Cast in a single pour. f.

Cross passages varying in length from 5-5.8m.

The shutter should be adaptable to suit this length, and the combined TBM horizontal driving tolerances from both bores g.

Due to access limitations for mechanical lifting, the shutter should take into consideration UK manual handling legislation. h.

Required for July 2022 2) Old Oak Common SCL Tunnels a.

Secondary lining shutters to facilitate the construction of both the Upline and Down running tunnels concurrently (2no complete sets of panels and carriages required) b.

Shutter internal dimensions ~10m diameter. c.

Formwork to be adaptable for a range of profiles, with common arc sections and make up pieces. d.

Cast in a single pour. e.

Shutter suitable for pours ~10m in length.

Adaptable for make-up pours f.

Formwork to be carriage mounted and hydraulically operated. g.

Secondary lining invert will have previously been cast flat. h.

Secondary lining thickness of ~350mm i.

Facing material suitable for up 20no. of pours, with no access to clean or oil, whilst still providing F2 finish. j.

Required for April 2023 3) Euston SCL Tunnels a.

Secondary lining shutters to facilitate the construction of i. both the Upline and Down Crossover tunnels concurrently (2no complete sets of panels and carriages required) ,internal dimensions ~10m diameter. ii.

Cavern crossover of varying sizes (15m, 13m and 11m), formwork to be adaptable for a range of profiles with common arc sections and make up pieces where possible. b.

Cast in a single pour. c.

Shutter suitable for pours ~10m in length.

Adaptable for make-up pours d.

Formwork to be carriage mounted and hydraulically operated. e.

Secondary lining invert will have previously been cast flat. f.

Secondary lining thickness of ~350mm g.

Facing material suitable for up 35no. of pours, with no access to clean or oil, whilst still providing F2 finish. h.

Required for Jan 2024

Key requirements

What the supplier must deliver

01

The scope for this package is

The scope for this package is the supply of SCL Formworks.

02

The shutter should be adaptable to suit

The shutter should be adaptable to suit this length, and the combined TBM horizontal driving tolerances from both bores.

03

Due to access limitations for mechanical lifting

Due to access limitations for mechanical lifting, the shutter should take into consideration UK manual handling legislation.

Derived from the notice text — always confirm against the original documents.

Buyer intelligence

Make the case to bid

Reveal who to approach at Skanska Costain STRABAG Joint Venture (SCS JV), and generate a go-to-market strategy from their news, accounts and people.

Source & provenance
OCID
a98a067f-9b63-46a2-8dcd-4337365ea1d2
Stage
contract · Contract
Source
Contracts Finder
Buyer ref
C4A58530177
View the original notice on Contracts Finder

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

Market context

Who wins this kind of work

The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.

Top suppliers & buyers in Construction

Assembling the market network…

Skanska Costain STRABAG Joint Venture (SCS JV)’s tender network

Assembling the network…

Also open now

Similar open tenders

Ravensbury Main Works Phase 3A and 3B Option PSQ

Clarion Regeneration Limited

Closes 29 Jul 2026Construction
£14.5mValue

External Works Package at a Residential Dwelling, North Leigh, Witney

West Oxfordshire District Council

Closes 24 Jul 2026Construction
£35kValue