RFP QuestBeta
Awarded · ResultStage · contract

Salford City Council

Agecroft Prison Footbridge Painting Scheme (Technical and Highways Works Framework - Lot 4 - Structures and Bridges

ConstructionCPV 45000000
Value£113k
Awarded9 Jun 2022
Published1 Aug 2022
RegionLondon
Outcome — awarded

This is a contract result notice, not an open opportunity. Details from the official award data.

Contract value in context
£113ktotal contract value
median £158k
this tender£0£6.5m

This sits in the lower-middle of the Construction band — a mid-scale opportunity. Based on 64,002 valued Construction tenders in our corpus.

The brief

The Highway Structures, Bridge and Subway Lot (Lot 4) will include the following elements of work: New construction could cover the following elements of work: a) Construction of new highway road bridges. b) Construction of new highway footbridges. c) Construction of retaining walls. d) Subways and culverts. e) Construction of traffic sign gantries.

Works may include: Site Clearance.

Earthworks.

Construction of drainage.

Planing and resurfacing.

Pavement construction.

Kerb and footway construction.

Structural concrete, steelwork and timber.

Waterproofing.

Brickwork, Blockwork and masonry.

Carriageway signs and lines.

Installation and improvement of street lighting.

Ducting and inspection chambers.

Planning and Supervision of utility diversions.

Installation of bridge parapet systems and vehicle restraint systems.

Installation of traffic signal equipment and liaison with TfGM UTC.

Installation of street furniture and traffic signs.

Landscaping.

Painting / protection against corrosion.

Repairs and reconstruction could include the following work: Structural repairs to timber, steelwork and concrete, masonry and brickwork.

Strengthening works.

Bridge re-decking and re-surfacing.

Parapet repairs and footway protection.

Installation of vehicle restraint systems.

Re- tiling of subways.

Painting / Graffiti removal / protection against corrosion.

Improvements to Drainage.

Improvement to lighting.

Work may include: Site Clearance.

Earthworks.

Construction of drainage.

Planing and resurfacing.

Pavement construction.

Kerbing and footway construction.

Structural concrete and steelwork.

Waterproofing.

Brickwork, Blockwork and masonry.

Carriageway signs and lines.

Installation and improvement of street lighting.

Ducting and inspection chambers.

Planning and Supervision of utility diversions.

Installation of bridge parapet systems and vehicle restraint systems.

Installation of traffic signal equipment and liaison with TfGM UTC.

Installation of street furniture and traffic signs.

Landscaping.

All material arising's that cannot be incorporated into the permanent works shall be disposed of offsite to a licensed tip using a grab wagon operated by a competent CPCS operator.

A waste transfer note must be provided for each load removed from site

Key requirements

What the supplier must deliver

01

All material arising's that cannot be incorporated

All material arising's that cannot be incorporated into the permanent works shall be disposed of offsite to a licensed tip using a grab wagon operated by a competent CPCS operator.

02

A waste transfer note must be provided

A waste transfer note must be provided for each load removed from site.

Derived from the notice text — always confirm against the original documents.

Buyer intelligence

Make the case to bid

Reveal who to approach at Salford City Council, and generate a go-to-market strategy from their news, accounts and people.

Source & provenance
OCID
0cb0096c-acfc-42b1-978f-072ab22f64b5
Stage
contract · Contract
Source
Contracts Finder
Buyer ref
SALF001-DN616574-60121330
View the original notice on Contracts Finder

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

Market context

Who wins this kind of work

The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.

Top suppliers & buyers in Construction

Scroll to explore the market network

Salford City Council’s tender network

Assembling the network…

Also open now

Similar open tenders

Framework Agreement for Small Works (Refurbishment, Painting and Civil Works)

Foreign, Commonwealth and Development Office

Closes 28 Jul 2026Construction
£466kValue

Station Painting & Platform Lining Framework

Northern Trains Limited

Closes 24 Aug 2026Construction
£18.0mValue