RFP QuestBeta
Awarded · ResultStage · contract

Dorset Healthcare University NHS Foundation Trust

GB-Poole: Installation of Hygenic Wall Coverings at St Ann's Hospital Kitchen Poole

ConstructionCPV 45000000 45200000 45210000 45400000 45450000 45453000 45215000 45430000 45432000
ValueValue not published
Awarded8 Feb 2016
Published8 Feb 2016
RegionUK-wide
Outcome — awarded

This is a contract result notice, not an open opportunity. Details from the official award data.

The brief

The scope of works will entail the installation over Altro Whiterock hygienic wall coverings to the following areas located in the main kitchen at St Ann’s Hospital, 69 Haven Road, Canford Cliffs, Poole, Dorset BH13 7LN.

The main contractor is to make allowances within his tendered price to remove the following items, please note the list is not exhaustive but will include: •All fixtures and fittings signage, notice boards knife racks etc •Wash hand basins and associated pipe work and brackets for the Whiterock to be installed behind •Sinks and associated stainless steel tabling •Wall cupboards •Racking The contractor is to employ a suitably qualified electrical contractor (NICEIC approved) to remove all light switch plates, socket outlets, control panels, mains isolators and all other wall mounted items to enable the hygienic wall covering to be installed.

Any damaged switches or sockets are to be reported to the Project Manager and an instruction will be given to replace such items with a modern equivalent.

Upon completion of works the main contractor is to employ a specialist contractor to carry out the required sealant works between wall covering and appliances.

Colour to be agreed at the pre contract meeting.

The works will take place over late afternoon and night periods.

This will mean that an electrician and plumber must be available to disconnect and re connect all items ready for the work area to be back in use the following day.

Requirements

What the notice asks for

01

This will mean that an electrician

This will mean that an electrician and plumber must be available to disconnect and re connect all items ready for the work area to be back in use the following day.

Sentences from the notice that state an obligation, surfaced automatically and shown in the order they appear. Not an exhaustive list — always confirm against the tender documents.

The gates

What this notice demands of you

1 named, none in explicit obligation language. Each one is quoted from the notice.

The contractor is to employ a suitably qualified electrical contractor (NICEIC approved) to remove all light switch plates, socket outlets, control panels, mains isolators and all other wall mounted items to enable the hygienic wall covering to be installed.

Matched against the notice text, so this is a floor — the tender pack will demand things the notice never mentions. “Says must” means the quoted sentence itself used obligation language; anything ambiguous is left as a mention.

Buyer intelligence

Make the case to bid

Reveal who to approach at Dorset Healthcare University NHS Foundation Trust, and generate a go-to-market strategy from their news, accounts and people.

Sign up free to unlock buyer intelligence

Free to start. Named contacts come from published notices; the strategy is generated from the buyer’s news, accounts and people.

Source & provenance
OCID
b36e49b9-8a83-43a0-8af3-25194cbb1a50
Stage
contract · Contract
Source
Contracts Finder
Buyer ref
BIP188706141
View the original notice on Contracts Finder

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

Market context

Who wins this kind of work

The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.

Top suppliers & buyers in Construction

This view needs WebGL, which this browser has turned off.

Dorset Healthcare University NHS Foundation Trust’s tender network

This view needs WebGL, which this browser has turned off.
Also open now

Similar open tenders

Kitchen Supply and Installations

Procurement Assist Limited c/o Integrated Facilities Management Bolton Ltd (iFM Bolton)

Closes 31 May 2029Construction
£75.0mValue

QEHKL239 Roof Re-covering Works

The Queen Elizabeth Hospital King's Lynn NHS Foundation Trust

Closes 20 Oct 2026Construction
£6.5mValue