RFP QuestBeta
ClosedStage · contract

Ministry of Defence

Supply Chain Notice: DELTA Dispersal - CIDP25 - WC1587863 Reconstruction of the Bulk Fuel Bower Park and New Interceptors at RAF Akrotiri D Dispersal , CYPRUS

ConstructionCPV 45000000 45200000 45220000 45223000
ValueValue not published
Deadline8 Dec 2025
Published3 Dec 2025
RegionWest Midlands
Timeline
Published 3 Dec 2025ClosedCloses 8 Dec 2025
Match for your company
Sign up free to see how well this tender matches your company — the score, the signals that align, and where the gaps are.
The brief

The location of this project is Cyprus (British Forces, RAF Akrotiri) WC1587863 Reconstruction of the Bulk Fuel Bower Park of D Dispersal (airfield), as per the design carried out under WC1315862 , the Works comprise, but not limited to, the following: - Break up and remove from site the existing concrete layers and other bound material layers. - Excavate further to reduce levels to sound subgrade. - Load proof subgrade and supply and lay Type 1 Granular Fill - Erect formwork, lay polythene sheet, cast brush finish concrete and form joints. - Seal joints with approved fuel resistant sealant. - Mark the Refueler Bowser Access Entrance and Parking Area. - Provide New Earth Points - Drain Channels New Interceptors as per the design carried out under WC1299848, the Works comprise, but not limited to, the following: - Break up and remove from site the existing asphalt and concrete layers and other bound material layers - Excavate further to reduce levels to the required levels and sound subgrade - Carry out works to install the interceptors and connect to the new drainage channels and main water discharge system - Reconstruct the defective asphalt parking area with concrete to match the BFVP project layout - Load proof subgrade and supply and lay Type 1 Granular Fill - Erect formwork, lay polythene sheet, cast brush finish concrete and form joints. - Mark the Sterile Area Markings at the Dispersal Entrance Further restrictions/instructions: - Existing topsoil: excavate from required areas to an average depth of 150mm and keep separate, including bulbs.

Upon completion of the works topsoil to be spread to areas at the same locations - Trees that need to be trimmed / cut, as per the instructions of Environmental advisor, works should be carried out by Ground Maintenance (CSP JV). - Materials to be delivered early on site - Ground maintenance - Environmental restrictions - Antiquities

Key requirements

What the supplier must deliver

01

Load proof subgrade and supply and lay

Load proof subgrade and supply and lay Type 1 Granular Fill.

02

Trees that need to be trimmed /

Trees that need to be trimmed / cut, as per the instructions of Environmental advisor,.

03

Works should be carried out by Ground

works should be carried out by Ground Maintenance (CSP JV).

Derived from the notice text — always confirm against the original documents.

Buyer intelligence

Make the case to bid

Reveal who to approach at Ministry of Defence, and generate a go-to-market strategy from their news, accounts and people.

Source & provenance
OCID
bbcee1a3-7058-4ce5-9f38-fca8dfe45fd9
Stage
contract · Contract
Source
Contracts Finder
Buyer ref
tender_513950/1536606
View the original notice on Contracts Finder

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

Market context

Who wins this kind of work

The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.

Top suppliers & buyers in Construction

Assembling the market network…

Ministry of Defence’s tender network

Assembling the network…

Also open now

Similar open tenders

Removal of existing Height Barriers, installation of new Height Barriers and general resurfacing of South Fistral Car Park

Newquay Town Council

Closes 24 Jul 2026Construction
£25kValue

Deeside New Build Police Station - D&B

The Police and Crime Commissioner for North Wales

Closes 21 Dec 2026Construction
£4.8mValue