English Heritage-Retail

Design, construction and installation of new shop at Rievaulx Abbey - AWARD

ConstructionCPV 45000000 45200000 45210000 45213000
Value£52,155
Awarded14 Dec 2015
Published23 Dec 2015
RegionSouth West

£52,155 — awarded.

Outcome — awarded

This is a contract result notice, not an open opportunity. Details from the official award data.

Contract value in context
£52ktotal contract value
median £158k
this tender£0£6.5m

This sits in the lower-middle of the Construction band — a mid-scale opportunity. Based on 64,002 valued Construction tenders in our corpus.

The brief

To design the shop layout within the brief given by English Heritage Contract Manager (Martin Wright), to manufacture off Site and install at Rievaulx Abbey between 16th May 2016 to 20th May (A maximum of 5 days installation allowed).

The following scope of work is included: • Work with main contractor at Site and the English Heritage Contract Manager, to ensure project delivered on time and within budget. • Design shop layout to brief, following English Heritage shop fit out policy • Attend design meetings and installation meetings as required. • Visit Site to take final measurements before manufacture – make any other site visits as required. • Provide samples of raw materials to be used to manufacture shop fit.

The finishes are set out in the pricing section of this document.

Sample and finishes board will be required. • Source and supply raw materials as specified for shop. • Manufacture of the counter and all units in retail shop, this includes the fitting of any in built directional lighting (LSD light bulbs to be used).

The counter to include 3 tills as shown on the plan and to allow for a CCTV monitor to be integrated and recessed into the desk (supplied and installed by the main contractor). • Although no electrical work is required, wall units and counter must have trunking and spur fittings installed ready for connection at Site. • Manufacture off Site and deliver to Site.

Note there are width restrictions on some roads leading to the site.

The price must include delivery to Site and vehicle restrictions accounted for. • Provide technical drawings for English Heritage M&E Maintenance and Electrical teams as required including counter layouts and unit layouts • Provide any other drawings as requested by English Heritage contract manager related to design of the shop and individual unit design • Install all shop units and counter to plans as agreed, this includes taking away any waste materials and packaging generated from the shop fit. • After 12 months identify and complete any snagging to the satisfaction of the English Heritage Contract Manager for sign off.

It will not include • Any alternations to buildings on Site • No electrical work on Site - connection of units and counter to site power will be completed by approved English Heritage contractors • No decoration work • No work to flooring

Requirements

What the notice asks for

01

Work with main contractor at Site

Work with main contractor at Site and the English Heritage Contract Manager, to ensure project delivered on time and within budget.

02

Provide samples of raw materials to

Provide samples of raw materials to be used to manufacture shop fit.

03

Source and supply raw materials as specified

Source and supply raw materials as specified for shop.

04

The counter to include 3 tills as

The counter to include 3 tills as shown on the plan and to allow for a CCTV monitor to be integrated and recessed into the desk (supplied and installed by the main contractor).

05

Although no electrical work is required, wall

Although no electrical work is required, wall units and counter must have trunking and spur fittings installed ready for connection at Site.

Sentences from the notice that state an obligation, surfaced automatically and shown in the order they appear. Not an exhaustive list — always confirm against the tender documents.

Buyer intelligence

Make the case to bid

Reveal who to approach at English Heritage-Retail , and generate a go-to-market strategy from their news, accounts and people.

Sign up free to unlock buyer intelligence

Free to start. Named contacts come from published notices; the strategy is generated from the buyer’s news, accounts and people.

Source & provenance
OCID
bf0c5870-456a-4b56-81a7-759449f79a6c
Stage
contract · Contract
Source
Contracts Finder
Buyer ref
P/REF 00000266 - AWARD
View the original notice on Contracts Finder

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

Market context

Who wins this kind of work

The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.

Top suppliers & buyers in Construction

This view needs WebGL, which this browser has turned off.

English Heritage-Retail ’s tender network

This view needs WebGL, which this browser has turned off.
Also open now

Similar open tenders

The Design, Installation and Construction of a Replacement Bridge at Eye Green Nature Reserve, Peterborough

Peterborough City Council

Closes 30 Sept 2026Construction
£100,000Value

Knutton Lane Depot - Installation of New Air Conditioning

The Borough Council of Newcastle-under-Lyme

Closes 22 Sept 2026Construction
£50,000Value