RFP QuestBeta
Awarded · ResultStage · contract

North York Moors National Park A

Blue Corridors in channel obstacle works - Rye 1

ConstructionCPV 45221220 45247220
Value£78k
Awarded24 May 2022
Published22 Jul 2022
RegionYorkshire and the Humber
Outcome — awarded

This is a contract result notice, not an open opportunity. Details from the official award data.

Contract value in context
£78ktotal contract value
median £158k
this tender£0£6.5m

This sits in the lower-middle of the Construction band — a mid-scale opportunity. Based on 64,002 valued Construction tenders in our corpus.

The brief

2.1 Objectives of the Contract The key objectives of the contract are to undertake easement works to the barriers, identified in Table 1.1, above.

All easement works are scheduled to take place in 2022.

Easements proposed to be constructed are summarised within Table 2.1, below: Table 2.1: Easement Summary Reference Barrier Easement Description Rye 20 Stone culvert Addition of two pre-weirs downstream of road culvert Rye 21 Single culvert Replacement with 3.0m span multi-plate bottomless arch culvert Rye 22 Triple culvert Replacement with 4.0m span multi-plate bottomless arch culvert The appointed Principal Contractor shall be responsible for carrying out all elements of the construction works subject to the approval of the Client / Project Manager.

This Pre-Construction Information (PCI) document should be read in conjunction with the Contract Data including the Risk Register and design drawings for the project.

2.2 Scope of Works The works are outlined below and detailed within the design drawings and shall be appointed under one contract per easement works.

This document details the works required to be conducted at the This PCI provides health and safety information as part of the Construction (Design and Management) Regulations 2015 (CDM 2015).

It shall be issued as part of the tender documents to the various organisations who have been invited to bid for the works.

The key activities for each easement works contract are outlined below.

All...annel; Erect Multi-Plate Bottomless Arch Culvert (MP-BAC) from pre-fabricated plates and cast in-situ concrete headwall, to tie-in to foundations; Place armour stone to watercourse at culvert inlet, outlet and along length of culvert, reinstate bed with stone, as per design specification; Backfill by placement and compaction (of retained fill) in layers, to sides and above crest of the installed arch culvert; and Reinstatement of track surface, with compacted Type 1 (minimum 0.2m) underlain by Terram 1000 (or similar).

2.2.3 Rye 22 Replacement of single culvert with 4.0m span bottomless arch culvert Works to be undertaken on a private track crossing Bonfield Gill; Remove existing track and culverts, excavate to commencing level for the placement of culvert foundations regrade existing bed, and install bed protection, as per design specification; Placement and compaction of Type 1 subbase as formation layer and cast in-situ strip foundations, including arch seating channel; Erect MP-BAC from pre-fabricated plates and cast in-situ concrete headwall, to tie-in to foundations; Add rock armour added to watercourse at culvert inlet, outlet and along length of culvert, reinstate bed with stone, as per design specification; Backfill by placement and compaction (of retained fill) in layers, to sides and above crest of the installed arch culvert; and Reinstatement of track surface with concrete slab.

Full details are supplied in the additional documents

Requirements

What the notice asks for

01

The appointed Principal Contractor shall be responsible

The appointed Principal Contractor shall be responsible for carrying out all elements of the.

02

This Pre-Construction Information (PCI) document should

This Pre-Construction Information (PCI) document should be read in conjunction with the Contract.

03

The works are outlined below and detailed

The works are outlined below and detailed within the design drawings and shall be appointed under.

04

This document details the works required

This document details the works required to be conducted at the.

Sentences from the notice that state an obligation, surfaced automatically and shown in the order they appear. Not an exhaustive list — always confirm against the tender documents.

The gates

What this notice demands of you

1 named, none in explicit obligation language. Each one is quoted from the notice.

Regulations 2015 (CDM 2015).

Matched against the notice text, so this is a floor — the tender pack will demand things the notice never mentions. “Says must” means the quoted sentence itself used obligation language; anything ambiguous is left as a mention.

Buyer intelligence

Make the case to bid

Reveal who to approach at North York Moors National Park A, and generate a go-to-market strategy from their news, accounts and people.

Sign up free to unlock buyer intelligence

Free to start. Named contacts come from published notices; the strategy is generated from the buyer’s news, accounts and people.

Source & provenance
OCID
a97c6a98-1f03-4a10-9ebb-cc5c934fe791
Stage
contract · Contract
Source
Contracts Finder
Buyer ref
MT226738
View the original notice on Contracts Finder

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

Market context

Who wins this kind of work

The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.

Top suppliers & buyers in Construction

This view needs WebGL, which this browser has turned off.

North York Moors National Park A’s tender network

This view needs WebGL, which this browser has turned off.
Also open now

Similar open tenders

QEHKL239 Roof Re-covering Works

The Queen Elizabeth Hospital King's Lynn NHS Foundation Trust

Closes 20 Oct 2026Construction
£6.5mValue

Refurbishment Works to Sumner House WC'S

PROGRESS HOUSING GROUP LIMITED

Closes 5 Oct 2026Construction
£90kValue