RFP QuestBeta
Awarded · ResultStage · contract

BMB Joint Venture (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty)

Thames Tideway Tunnel - C405 Main Works West - Bulkheads (Acton)

ConstructionCPV 45262670
Value£4k
Awarded16 Jun 2020
Published8 Jan 2021
RegionLondon
Outcome — awarded

This is a contract result notice, not an open opportunity. Details from the official award data.

Contract value in context
£4ktotal contract value
median £158k
this tender£0£6.5m

This sits below the typical range for Construction contracts — a smaller, more accessible award. Based on 64,002 valued Construction tenders in our corpus.

The brief

The Thames Tideway Tunnel project (the Project) will control CSO discharges by intercepting and diverting combined sewage flows into a new storage and transfer tunnel.

The main tunnel will run from Acton Storm Tanks in west London to Abbey Mills Pumping Station in the east, where it will connect to the Lee Tunnel, which will transfer the combined sewage to Beckton Sewage Treatment Works for treatment.

The Project extends from Acton Storm Tanks in west London, to Abbey Mills Pumping Station in east London.

The Project includes associated works at Beckton STW, Shad Thames Pumping Station and Bekesbourne Street.

The geographic layout of the Project and local authorities through which it passes is shown in Figure 1.

The Project comprises: a. tunnels: i. a main tunnel which will capture and store combined sewage from CSOs along its route and transfer it to Abbey Mills Pumping Station, from where the Lee Tunnel will transfer it for treatment at Beckton Sewage Treatment Works ii.

11 connection tunnels, which will link flows from CSOs to the main tunnel. b.

Worksites: i. five main tunnel Worksites (drive and/or reception sites) ii.

16 CSO Worksites iii. two System modification Worksites Thames Tideway Tunnel iv. works at Beckton Sewage Treatment works.

Section 4: Scope of Works Supply a price for manufacture and deliver 4no.

Bulkheads 3 design (i.e.

8 x Panel 3a, 4 x Panel 3b).

Weld detail is included in the latest drawing file (Acton Bulkhead Drawing BH3-6 P02 (Latest)).

No construction or manufacture should commence until BMB have confirmed approval of drawings.

Approved for construction drawings will be issued as soon as they become available.

All deliveries are to be in accordance with the delivery requirements (FORS).

Returned quotations will be evaluated by BMB JV's (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty) Procurement team in conjunction with our design and engineering teams.

Quotations will be evaluated based on; Cost Timeliness of return Adherence to and demonstration of understanding of the drawings and specifications provided at this point.

Provision of accurate product specifications to accompany the quotation.

Supplier experience of similar projects,evidence of this will be requested should the initial quotation be of interest.

Should the candidate supplier be shortlisted they will then be contacted directly by a member of the BMB Procurement Team within two weeks of shortlisting to discuss the requirement in detail.

BMB Joint Venture (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty) BMB-JV Tideway West, Acton Storm Tanks, Canham Road, W3 7SR

Key requirements

What the supplier must deliver

01

Supply a price for manufacture and deliver

Supply a price for manufacture and deliver 4no.

02

No construction or manufacture should commence until

No construction or manufacture should commence until BMB have confirmed approval of drawings.

03

Adherence to and demonstration of understanding

Adherence to and demonstration of understanding of the drawings and specifications provided at this point.

04

Supplier experience of similar projects,evidence of this

Supplier experience of similar projects,evidence of this will be requested should the initial quotation be of interest.

05

Should the candidate supplier be shortlisted they

Should the candidate supplier be shortlisted they will then be contacted directly by a member of the BMB Procurement Team within two weeks of shortlisting to discuss the requirement in detail.

Derived from the notice text — always confirm against the original documents.

Buyer intelligence

Make the case to bid

Reveal who to approach at BMB Joint Venture (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty), and generate a go-to-market strategy from their news, accounts and people.

Source & provenance
OCID
c4703176-d62e-4422-8495-fb0891301da1
Stage
contract · Contract
Source
Contracts Finder
Buyer ref
C4A49495358
View the original notice on Contracts Finder

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

Market context

Who wins this kind of work

The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.

Top suppliers & buyers in Construction

Scroll to explore the market network

BMB Joint Venture (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty)’s tender network

Assembling the network…

Also open now

Similar open tenders

Ravensbury Main Works Phase 3A and 3B Option PSQ

Clarion Regeneration Limited

Closes 29 Jul 2026Construction
£14.5mValue

PENLEE HOUSE GALLERY & MUSEUM ROOF REPAIR WORKS

Penzance Town Council

Closes 11 Aug 2026Construction
£105kValue