Cambridge City Council - Mill Road Cemetery Footpaths
This is a contract result notice, not an open opportunity. Details from the official award data.
This sits in the lower-middle of the Construction band — a mid-scale opportunity. Based on 64,002 valued Construction tenders in our corpus.
The cemetery is an English Heritage Grade II listed site and is also designated a County Wildlife Site.
The cemetery's main footpath(s), from the main pedestrian and vehicular entrance off Mill Road, pass through the middle of the cemetery, a number of connecting smaller footpaths navigate the boundary of the cemetery.
These footpaths allow access to this important and historic open space which is frequently used by both cyclists and pedestrians.
The existing paths have been constructed from an unbound aggregate construction (possibly Carstone) and generally in dry periods the paths are in good condition.
Issues arise from the verges either side of the paths being higher than the path surfaces; as the paths are now compacted they are not porous and therefore water pools on the paths, with large puddles in the winter.
The purpose of the works will be to improve the continuity and effectiveness of the paths using the existing paths as the foundations.
Timber edgings shall be installed to better define the path width; the base will be constructed to re-profile the shape of the path before a new surface layer is put down.
The grass verges shall be top soiled and seeded to bring them to the level of the new path.
Some of the paths to the east side and through the middle of the cemetery have very little or no construction.
To ensure that the paths remain in keeping with the natural and historic environment of the cemetery they shall be constructed using a self-binding aggregate construction, similar in appearance to the existing construction.
What the supplier must deliver
Timber edgings shall be installed to better
Timber edgings shall be installed to better define the path width; the base will be constructed to re-profile the shape of the path before a new surface layer is put down.
The grass verges shall be top soiled
The grass verges shall be top soiled and seeded to bring them to the level of the new path.
To ensure that the paths remain in
To ensure that the paths remain in keeping with the natural and historic environment of the cemetery they shall be constructed using a self-binding aggregate construction, similar in appearance to the existing construction.
Derived from the notice text — always confirm against the original documents.
Make the case to bid
Reveal who to approach at Cambridgeshire District Councils, and generate a go-to-market strategy from their news, accounts and people.
Ask me about this tender, the buyer, who wins their work, or whether you should bid.
- OCID
- 37aa5e11-6a92-4e9d-b9b6-5490ba224512
- Stage
- contract · Contract
- Source
- Contracts Finder
- Buyer ref
- CAMBDC001-DN333902-57189070
Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.
Who wins this kind of work
The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.
Top suppliers & buyers in Construction
Cambridgeshire District Councils’s tender network
Assembling the network…