GB-Harborne: Tennal Grange - Office Refurbishment

ConstructionCPV 45000000 45200000 45260000 45262000 45400000 45450000 45453000
Value£113k
Deadline16 May 2016
Published10 May 2016
RegionWest Midlands
Timeline
Published 10 May 2016ClosedCloses 16 May 2016
Contract value in context
£113ktotal contract value
median £158k
this tender£0£6.5m

This sits in the lower-middle of the Construction band — a mid-scale opportunity. Based on 64,002 valued Construction tenders in our corpus.

Match for your company
Sign up free to see how well this tender matches your company — the score, the signals that align, and where the gaps are.
The brief

NOTE: This notice was updated on 10 May 2016 for the following reason: Update to bidding procedure Update to PQQ and Cyber Essential SecurityThe working area is self-contained within the adjoining building to Tennal Grange, marked orange on the enclosed drawing.

The building is a multipurpose user building with offices, conference room and Cadet HQ.

Access to the working area is through the main double door to the front elevation.

You are to keep these clear at all times and the adjacent drill hall/gym to which the working area opens onto.

The gym is used daily mainly mornings, lunch times and evenings.

Working times are 8.30am - 4.30am any other times are grace and favor by our Caretaker contact details will be given on awarding tender.

Materials will be contained within the room whilst work is being carried out; you are to allow for protection to the existing floor covering.

You are to carry out a full risk and method statement after a pre-contract meeting.

Radios will not be allowed.

Fire assembly points and fire alarm procedures will be discussed ablutions on site can be used.

Other alarms in the building should not be affected by your building works but notification of vibrations must be notified to personnel within the building.

Core drilling within the boiler room is flagged up due to the main gas boiler adjacent, temporary dust sheet should be erected while this operation is taken place.

Vehicle parking will be allocated, as skip positioning during the pre-contract meeting.

You are to advise us as to the contract construction time, produce a programme of works.

You are to allow for possible attendance of RFCA IT contractors if necessary.

There maybe a requirement to install cabling towards the end of the contract.

You will be introduced to the RFCA IT contractors to elevate working area clashes.

You are to design LED lighting for office standard and arrange lights to furniture layout. (Furniture by others) A contingency sum of £1000.00 is to be included for unseen works.

To view you are to contact Mr Nigel Locke at Tennal Grange on 07718358754.

Key requirements

What the supplier must deliver

01

Other alarms in the building should not

Other alarms in the building should not be affected by your building works but notification of vibrations must be notified to personnel within the building.

02

Core drilling within the boiler room is

Core drilling within the boiler room is flagged up due to the main gas boiler adjacent, temporary dust sheet should be erected while this operation is taken place.

Derived from the notice text — always confirm against the original documents.

What this bid requires

Skills, tools & certifications

Detected from the notice — the capabilities and credentials this bid calls for. Click one to see who wins that work.

Buyer intelligence

Make the case to bid

Reveal who to approach at WM-RFCA, and generate a go-to-market strategy from their news, accounts and people.

Source & provenance
OCID
cfc3c7dd-f14c-4e46-9447-e694afd15b68
Stage
contract · Contract
Source
Contracts Finder
Buyer ref
BIP41665429
View the original notice on Contracts Finder

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

Market context

Who wins this kind of work

The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.

Top suppliers & buyers in Construction

Assembling the market network…

WM-RFCA’s tender network

Assembling the network…

Also open now

Similar open tenders

NSDC-1681 Wellow Green Refurbishment

Newark And Sherwood District Council

Closes 7 Aug 2026Construction
£500kValue

Parsley Hay - Public WC Refurbishment

Peak District National Park Authority

Closes 31 Jul 2026Construction
£30kValue