AwardedOCID: ocds-h6vhtk-055080

Culvert Flow Gauging Structure - Ceredigion

The Authority invites you to tender for a contract for the provision of the construction of a flow monitoring structure at the outfall of a historic culvert. This culvert drains the dressing floor of a former mine site. The purpose of the structure is to enable accurate measurement of water flows entering a recently lined stream. The construction of a flow gauging structure at Frongoch is necessary to measure the volume of water discharging from the culvert beneath the Frongoch dressing floor. This will enable accurate quantification of heavy metal loading into the Frongoch stream, and subsequently into the Nant Cell and Afon Ystwyth. Accurate flow measurement is essential for a comprehensive assessment of the need for a mine water treatment scheme, and future design. Future flow monitoring, assessment or design does not form part of this contract. The works associated with the Frongoch Culvert Flow Monitoring are inclusive of breaking into the existing below ground culvert, as shown on drawing FCFM-AEC-XX-XX-DR-C-0003, the installation of approximately 80m of pipework, a headwall with associated access steps and V-notch weir to allow for flow monitoring.

Buyer
Mining Remediation Authority
Contract Value
Value not disclosed
Deadline
No deadline set
Published
30 Jan 2026

About This Mining Remediation Authority Contract

This award stage contract from Mining Remediation Authority was published in 2026. The Culvert Flow Gauging Structure - Ceredigion contract.

This UK government contract opportunity is part of the public procurement process, openly available via Find a Tender.

Contract Analytics

Culvert Flow Gauging Structure - Ceredigion - Scope of Work

0 phases • 0 requirements • 0 capabilities
  • The Authority invites you to tender for a contract for the provision of the construction of a flow monitoring structure at the outfall of a historic culvert. This culvert drains the dressing floor of a former mine site.
  • The purpose of the structure is to enable accurate measurement of water flows entering a recently lined stream.
  • The construction of a flow gauging structure at Frongoch is necessary to measure the volume of water discharging from the culvert beneath the Frongoch dressing floor.
  • This will enable accurate quantification of heavy metal loading into the Frongoch stream, and subsequently into the Nant Cell and Afon Ystwyth.
  • Accurate flow measurement is essential for a comprehensive assessment of the need for a mine water treatment scheme, and future design. Future flow monitoring, assessment or design does not form part of this contract.
  • The works associated with the Frongoch Culvert Flow Monitoring are inclusive of breaking into the existing below ground culvert, as shown on drawing FCFM-AEC-XX-XX-DR-C-0003, the installation of approximately 80m of pipework, a headwall with associated access steps and V-notch weir to allow for flow monitoring.

Ask the AI assistant for deeper analysis of this scope

Contract Value

Fixed PriceSingle contract value agreed upfront
Value not disclosed

Key Dates

Important deadlines and milestones

UK Time

Notice Published

Tender opportunity made public on Find a Tender

Fri, 30 Jan 2026
Passed

What This Mining Remediation Authority Contract Means

For Citizens

This is a public procurement by Mining Remediation Authority. All UK government contracts are publicly accessible for transparency.

For Businesses

This Mining Remediation Authority contract has been awarded. Review for market intelligence.

Your Match Score

Company Match Analysis

Analyze how well this tender matches your company profile and capabilities.

Mining Remediation Authority

Contact Information

View All Contracts
Mining Remediation Authority
Spending trends, sector breakdown & more →

Quick Facts

Stage
Award
Status
complete
CPV Codes
0

Reference ID

ocds-h6vhtk-055080

Win More UK Government Contracts

RFP.quest helps UK businesses find and win public sector tenders. Our AI platform analyzes requirements, identifies gaps, and helps craft winning proposals.

UK tender data from Find a Tender under the Open Government Licence. Powered by RFP.quest.

Tender Assistant

I can help you understand this Mining Remediation Authority contract:

• Requirements and evaluation criteria • Risks and gaps analysis • Buyer and market context • Related opportunities

Ask me anything about "Culvert Flow Gauging Structure - Ceredigion"!

Powered by CopilotKit

Culvert Flow... | Mining Remediation Authority 2026