RFP QuestBeta
OpenStage · pipeline

MOTT MACDONALD LIMITED

Avanti Leicester - Temporary Site

EducationCPV 80211000
Value£2.1m
Deadline
Published4 Apr 2018
RegionNationwide
Contract value in context
£2.1mtotal contract value
median £84k
this tender£0£2.4m

This is a large award for Education & Training — above three-quarters of comparable contracts. Based on 23,516 valued Education & Training tenders in our corpus.

Match for your company
Sign up free to see how well this tender matches your company — the score, the signals that align, and where the gaps are.
The brief

A building that was constructed in 1902, located on Narborough Road, Leicester (LE3 0BT), requires refurbishment to meet the temporary demand of the secondary school students.

The existing building was last used as an all through school in 2014, which has since been unoccupied and it is understood the primary mechanical and electrical systems have been turned off.

It is understood that the building is also listed on the external elevations, and therefore external works are expected to be kept to a minimum.

However, works may be required to the existing windows.

The roof/trusses and the panelling in the first-floor main hall are also listed (floor plans to be issued in the tender pack).

No significant works are to be anticipated in the main Hall, including to the listed elements.

The required space within the temporary building will need to be sufficient to accommodate 180 No. students in the first year, which will increase up to 540 No. students in the third year.

The capacity of the school will need to increase to accommodate 180 No. students each year, with the initial 180 No. students starting school in late August/start of September 2018.

The planned construction sequence for the building is expected to be split over 2 phases.

Phase one will need to be completed by the start of the Academic school year in late August/ early September 2018, with phase two being completed in time for the start of the second academic year (Sept 2019), whilst the School is occupied on the ground floor with students/staff after completion of Phase 1.

The phases will be divided by the three-storey building, with phase 1 completing the ground floor and phase 2 completing the first, second and intermediate floors.

Safeguarding between pupils/Contractors for Phase 2 works will be assisted by permitting Contractor use of a segregated staircore to the upper floors.

Survey information will be provided as part of the tender information to allow the extent of the works to be accurately priced.

Survey information that can be expected to be provided within the tender pack will include, R&D, Building Condition (including measurements) and M&E: Shown below is a bullet point summary of the potential works.

Note that the GIFA is approximately 4500m2: • Replace Existing Kitchen with New • Potential Replacement/Refurbishment of Existing Heating System (Including Boilers) • Repairs to Roof and Localised Repairs to Existing Windows (listed) • Localised Repairs to Existing Plaster due to Water Damage (Currently Lath and Plaster) • New Fire Doors Installed • New Fire Alarms/Emergency Escape Lighting • New Floor Finishes Throughout • Re-cabling and Trunking within Classrooms for Small Power and Data (ICT) • New Lighting Throughout • Potential for Ventilation to Certain Areas • General Redecoration • Minimal Reconfiguration of Internal Walls Expected • Fitting of Furniture and Equipment • Multiple Ramps with Potential Chair Lifts Asbestos encountered will need to be managed.

Key requirements

What the supplier must deliver

01

It is understood that the building is

It is understood that the building is also listed on the external elevations, and therefore external works are expected to be kept to a minimum.

02

However, works may be required to

However, works may be required to the existing windows.

03

The required space within the temporary building

The required space within the temporary building will need to be sufficient to accommodate 180 No. students in the first year, which will increase up to 540 No. students in the third year.

04

The capacity of the school will need

The capacity of the school will need to increase to accommodate 180 No. students each year, with the initial 180 No. students starting school in late August/start of September 2018.

05

The planned construction sequence for the building

The planned construction sequence for the building is expected to be split over 2 phases.

Derived from the notice text — always confirm against the original documents.

Buyer intelligence

Make the case to bid

Reveal who to approach at MOTT MACDONALD LIMITED, and generate a go-to-market strategy from their news, accounts and people.

Source & provenance
OCID
db23a486-42d8-41f7-a368-2399658026c1
Stage
pipeline · Closed
Source
Contracts Finder
Buyer ref
392419
View the original notice on Contracts Finder

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

Market context

Who wins this kind of work

The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.

Top suppliers & buyers in Education & Training

Scroll to explore the market network

MOTT MACDONALD LIMITED’s tender network

Assembling the network…