RFP QuestBeta
ClosedStage · contract

BMB Joint Venture (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty)

Thames Tideway Tunnel - C405 Main Works West - Hammersmith Connection Culvert Formwork Design & Supply

Construction MaterialsCPV 44114000 44221400 45421142
Value£12k
Deadline4 Sept 2020
Published8 Jan 2021
RegionLondon
Timeline
Published 8 Jan 2021ClosedCloses 4 Sept 2020
Contract value in context
£12ktotal contract value
median £135k
this tender£0£4.1m

This sits below the typical range for Construction Materials & Structures contracts — a smaller, more accessible award. Based on 10,341 valued Construction Materials & Structures tenders in our corpus.

Match for your company
Sign up free to see how well this tender matches your company — the score, the signals that align, and where the gaps are.
The brief

The Thames Tideway Tunnel project (the Project) will control CSO discharges by intercepting and diverting combined sewage flows into a new storage and transfer tunnel.

The main tunnel will run from Acton Storm Tanks in west London to Abbey Mills Pumping Station in the east, where it will connect to the Lee Tunnel, which will transfer the combined sewage to Beckton Sewage Treatment Works for treatment.

The Project extends from Acton Storm Tanks in west London, to Abbey Mills Pumping Station in east London.

The Project includes associated works at Beckton STW, Shad Thames Pumping Station and Bekesbourne Street.

The geographic layout of the Project and local authorities through which it passes is shown in Figure 1.

The Project comprises: a. tunnels: i. a main tunnel which will capture and store combined sewage from CSOs along its route and transfer it to Abbey Mills Pumping Station, from where the Lee Tunnel will transfer it for treatment at Beckton Sewage Treatment Works ii.

11 connection tunnels, which will link flows from CSOs to the main tunnel. b.

Worksites: i. five main tunnel Worksites (drive and/or reception sites) ii.

16 CSO Worksites iii. two System modification Worksites Thames Tideway Tunnel iv. works at Beckton Sewage Treatment works.

Scope of Works BMBJV requires design and supply of shuttering for a Connection Culvert at Hammersmith Pumping Station (HAMPS).

Details of the required culvert are outlined in this ITT and drawings for the required concrete design are also contained.

BMBJV is constructing the Connection Culvert as part of the Thames Tideway West (TTW) project.

This network will divert all storm overflows that are currently being pumped into the River Thames into the Main Tideway Overflow Tunnel.

The Culvert joins the Interception chamber to the CSO Shaft.

BMB JVs work in the Connection Culvert includes: - Back blinding of the Secant Piles to ensure a slip surface to the culvert walls - The concrete pour of walls and roof slabs of the culvert - Casting of connecting walls from Culvert to Interception Chamber Returned quotations will be evaluated by BMB JV's (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty) Procurement team in conjunction with our design and engineering teams.

Quotations will be evaluated based on; Cost Timeliness of return Adherence to and demonstration of understanding of the drawings and specifications provided at this point.

Provision of accurate product specifications to accompany the quotation.

Supplier experience of similar projects,evidence of this will be requested should the initial quotation be of interest.

Should the candidate supplier be shortlisted they will then be contacted directly by a member of the BMB Procurement Team within two weeks of shortlisting to discuss the requirement in detail.

BMB Joint Vent

Key requirements

What the supplier must deliver

01

BMBJV requires design and supply of shuttering

BMBJV requires design and supply of shuttering for a Connection Culvert at Hammersmith Pumping Station (HAMPS).

02

Back blinding of the Secant Piles

Back blinding of the Secant Piles to ensure a slip surface to the culvert walls.

03

Adherence to and demonstration of understanding

Adherence to and demonstration of understanding of the drawings and specifications provided at this point.

04

Supplier experience of similar projects,evidence of this

Supplier experience of similar projects,evidence of this will be requested should the initial quotation be of interest.

05

Should the candidate supplier be shortlisted they

Should the candidate supplier be shortlisted they will then be contacted directly by a member of the BMB Procurement Team within two weeks of shortlisting to discuss the requirement in detail.

Derived from the notice text — always confirm against the original documents.

Buyer intelligence

Make the case to bid

Reveal who to approach at BMB Joint Venture (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty), and generate a go-to-market strategy from their news, accounts and people.

Source & provenance
OCID
f317f9e8-8070-4243-8c63-e0cc41a24518
Stage
contract · Contract
Source
Contracts Finder
Buyer ref
C4A50766762
View the original notice on Contracts Finder

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

Market context

Who wins this kind of work

The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.

Top suppliers & buyers in Construction Materials & Structures

Assembling the market network…

BMB Joint Venture (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty)’s tender network

Assembling the network…

Also open now

Similar open tenders

Manufacture and supply of Culvert & Wing Walls for Leicestershire County Council

Leicestershire County Council

Closes 27 Jul 2026Construction Materials
£80kValue

Project Tullie Phase 3: Central Sculpture Mount Designer and Maker RfQ

TULLIE HOUSE MUSEUM AND ART GALLERY TRUST

Closes 17 Aug 2026Construction Materials
Value not publishedValue