Northern Lighthouse Board

GB-Edinburgh: Construction of Portain Beacon

Transport EquipmentCPV 34930000 98363000 45200000 45244100 45244000
Value£113k
Awarded15 Oct 2020
Published6 Sept 2021
RegionScotland
Outcome — awarded

This is a contract result notice, not an open opportunity. Details from the official award data.

Contract value in context
£113ktotal contract value
median £102k
this tender£0£2.9m

This sits in the upper-middle of the Transport Equipment band — a substantial contract for the sector. Based on 15,368 valued Transport Equipment tenders in our corpus.

The brief

Construction of Portain Beacon - Description of Works It is proposed to construct a 10.5m high structure with a 3 mile nautical light positioned a minimum of 6m above mean high water springs to replace the existing Portain Buoy.

The structure will be coloured predominantly green to act as a day mark and a ladder is to be provided from mean low water level to the working platform to allow for safe access during future maintenance visits and inspections.

A 4m high cylindrical gravity concrete base foundation will be formed directly onto the bedrock using 3.0m Ø precast concrete manhole rings as permanent formwork which will be filled with marine grade underwater concrete and stainless steel reinforcement during the works.

Once the concrete has cured and reached sufficient strength, the pre-fabricated stainless steel structure will be connected to the foundation using 8 no.

M30 stainless steel threaded holding down bolts which will cast in during the concrete pour.

A ladder leading to the working platform shall be attached to the main support colum which will allow safe access to the LED lantern and topmark located at the top of it.

Please refer to the tender documents for more detail on the project work.

A site visit is planned on 27 August 2020.

Should the weather conditions be a problem for travel an alternative date will be arranged with all interested parties.

Key requirements

What the supplier must deliver

01

A ladder leading to the working platform

A ladder leading to the working platform shall be attached to the main support colum which will allow safe access to the LED lantern and topmark located at the top of it.

02

Should the weather conditions be a problem

Should the weather conditions be a problem for travel an alternative date will be arranged with all interested parties.

Derived from the notice text — always confirm against the original documents.

Buyer intelligence

Make the case to bid

Reveal who to approach at Northern Lighthouse Board, and generate a go-to-market strategy from their news, accounts and people.

Source & provenance
OCID
a5b9211a-60c4-42ff-84aa-c074a5376f03
Stage
contract · Contract
Source
Contracts Finder
Buyer ref
BIP623765257
View the original notice on Contracts Finder

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

Market context

Who wins this kind of work

The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.

Top suppliers & buyers in Transport Equipment

Scroll to explore the market network

Northern Lighthouse Board’s tender network

Assembling the network…