Northern Lighthouse Board

GB-Edinburgh: MAJOR REFURBISHMENT OF PLADDA LIGHTHOUSE

ConstructionCPV 45000000 45400000 45440000 45442000 45450000 45453000
Value£199k
Awarded24 Apr 2024
Published26 Apr 2024
RegionScotland
Outcome — awarded

This is a contract result notice, not an open opportunity. Details from the official award data.

Contract value in context
£199ktotal contract value
median £158k
this tender£0£6.5m

This sits in the upper-middle of the Construction band — a substantial contract for the sector. Based on 64,002 valued Construction tenders in our corpus.

The brief

Refurbishment work.

Painting and glazing work.

Painting work.

Painting work of buildings.

Painting and protective-coating work of structures.

Painting work of structures.

Pladda Lighthouse is situated on the pear-shaped Island of Pladda half a mile off the South East corner of Arran at Latitude 55o 25.5' N, Longitude 05o 07.3' W.

The current light, which was automated in 1990, stands 29 meters high and is situated 40 metres above sea level.

The light has a white flashing character (3) every 30 seconds giving a nautical range of 17 miles.

The only property the NLB currently own on the Island is the lighthouse tower, the smaller tower below, the link corridor building between both towers, and the solar panel structure.

All remaining buildings and land are privately owned.

Due to the location of this site, the majority of materials and equipment will be transported to and from site via NLB Tender & Helicopter.

Main Items of work: The main items of project work are as listed below:- 1.Carry out a full Asbestos Refurbishment / Demolition Survey on all NLB operational buildings prior to the commencement of any work.

The survey, sample collection and sample analysis must be carried by a UKAS accredited contractor in accordance with ISO 17020, ISO 17025 and Health and Safety Executive Guidance Notes; HSG 248, Asbestos: The analysts' guide for sampling, analysis and clearance procedures" and HSG264, Asbestos: The survey guide.

2.The Principal Contractor is expected to test the existing 'HCL' fall arrest system and re-certify it if necessary before use.

The Principal Contractor is to provide the Project Leader with all relevant test certification for record and audit purposes.

3.Deliver all plant/materials/camp to NLB Oban packaged for helicopter underslinging 4.Land plant/materials/camp on site and establish site.

5.Full redecoration of the station Key dates: 10/7/2024 - Contractor to deliver all plant/materials to NLB Oban for loading aboard the NLV Pharos - all loads to be prepared as per NLB Helicopter underslinging guidance 24/7/2024 - NLB Ship and Helicopter will deliver all plant/materials to site - contractor must be on site to receive loads.

NLV Pharos will be available to provide accommodation while site camp is constructed 29/10/2024 - NLB Ship and Helicopter will clear site and return all contractor's plant/materials to NLB Oban for collection - all loads to be prepared and weighed as per NLB Helicopter underslinging guidance with dangerous goods signed off accordingly

Key requirements

What the supplier must deliver

01

2.The Principal Contractor is expected to test

2.The Principal Contractor is expected to test the existing 'HCL' fall arrest system and re-certify it if necessary before use.

02

The Principal Contractor is to provide

The Principal Contractor is to provide the Project Leader with all relevant test certification for record and audit purposes.

03

3.Deliver all plant/materials/camp to NLB Oban packaged

3.Deliver all plant/materials/camp to NLB Oban packaged for helicopter underslinging.

04

Contractor to deliver all plant/materials to NLB

Contractor to deliver all plant/materials to NLB Oban for loading aboard the NLV Pharos.

05

NLB Ship and Helicopter will deliver all

NLB Ship and Helicopter will deliver all plant/materials to site.

Derived from the notice text — always confirm against the original documents.

Buyer intelligence

Make the case to bid

Reveal who to approach at Northern Lighthouse Board, and generate a go-to-market strategy from their news, accounts and people.

Source & provenance
OCID
1c4a5156-616e-47eb-8098-98c6bfda3f65
Stage
contract · Contract
Source
Contracts Finder
Buyer ref
BIP858186288
View the original notice on Contracts Finder

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

Market context

Who wins this kind of work

The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.

Top suppliers & buyers in Construction

Scroll to explore the market network

Northern Lighthouse Board’s tender network

Assembling the network…

Also open now

Similar open tenders

Major Void Refurbishment

Northamptonshire Partnership Homes

Closes 30 Jul 2026Construction
£20.0mValue

Mundy Playing Fields - Package 2: Pavilion Refurbishment & Reorganisation Works

Thornbury Town Council

Closes 24 Aug 2026Construction
£295kValue