Northern Lighthouse Board

GB-Edinburgh: REFURBISHMENT AND UPGRADE OF AILSA CRAIG LIGHTHOUSE

ConstructionCPV 45442121 44114000 45440000 45442110 45442100 45422100 45442120
Value£205k
Awarded16 May 2024
Published21 May 2024
RegionScotland
Outcome — awarded

This is a contract result notice, not an open opportunity. Details from the official award data.

Contract value in context
£205ktotal contract value
median £158k
this tender£0£6.5m

This sits in the upper-middle of the Construction band — a substantial contract for the sector. Based on 64,002 valued Construction tenders in our corpus.

The brief

Painting work.

Painting work of buildings.

Painting and protective-coating work of structures.

Painting work of structures.

Concrete.

Woodwork.

Painting and glazing work.

Ailsa Craig Lighthouse is located on Ailsa Craig, an island in the Firth of Clyde, just offshore from Girvan, South Ayrshire at Latitude 55° 15.126'N, Longitude 005° 06.523'W.

The lighthouse was established in 1886 to mark the west side of the main entrance into the Clyde.

Designed by David Alan Stevenson and constructed by Hill and Son of Leith, the painted white stone tower stands 11 metres high at an elevation of 18 metres above sea level.

The existing optic has a range of 17 nautical miles with a flashing white character (1) every 4 seconds.

The Lighthouse station consists of a tower, engine room, control room, battery room, store room and domestic accommodation.

The former lightkeeper's houses and all other buildings are privately owned.

The main items of project work are as listed below:- 1.Carry out a full Asbestos Refurbishment / Demolition Survey on all NLB operational buildings prior to the commencement of any work.

The survey, sample collection and sample analysis must be carried by a UKAS accredited contractor in accordance with ISO 17020, ISO 17025 and Health and Safety Executive Guidance Notes; HSG 248, Asbestos: The analysts' guide for sampling, analysis and clearance procedures" and HSG264, Asbestos: The survey guide.

2.The Principal Contractor is expected to test the existing 'HCL' fall arrest system and re-certify it if necessary before use.

The Principal Contractor is to provide the Project Leader with all relevant test certification for record and audit purposes.

3.Deliver all plant, tools, materials, etc to NLB Oban packaged for helicopter under-slinging.

4.Land plant, tools, materials, etc on site and establish welfare facilities.

5.Carry out minor civil works and full redecoration of the lighthouse station.

Tender issue: 8 March 2024 Mandatory Pre-tender site visit: 5 April 2024 (TBC) Tender return date: 18 April 2024 Latest date contract to be awarded to successful contractor: Est.

3 May 2024 Materials, plant, etc. to be delivered to NLB Oban depot: 31 May 2024 Materials, plant, etc. to be landed on site by ship / helicopter: 11 June 2024 Site clearance / de-mobilisation: 26 October 2024

Requirements

What the notice asks for

01

2.The Principal Contractor is expected to test

2.The Principal Contractor is expected to test the existing 'HCL' fall arrest system and re-certify it if necessary before use.

02

The Principal Contractor is to provide

The Principal Contractor is to provide the Project Leader with all relevant test certification for record and audit purposes.

03

3.Deliver all plant, tools, materials, etc

3.Deliver all plant, tools, materials, etc to NLB Oban packaged for helicopter under-slinging.

Sentences from the notice that state an obligation, surfaced automatically and shown in the order they appear. Not an exhaustive list — always confirm against the tender documents.

The gates

What this notice demands of you

3 named in obligation language, 0 mentioned. Each one is quoted from the notice.

ISO 17020 (inspection bodies)says mustStandards you certify to
The survey, sample collection and sample analysis must be carried by a UKAS accredited contractor in accordance with ISO 17020, ISO 17025 and Health and Safety Executive Guidance Notes;
ISO 17025 (testing & calibration laboratories)says mustStandards you certify to
The survey, sample collection and sample analysis must be carried by a UKAS accredited contractor in accordance with ISO 17020, ISO 17025 and Health and Safety Executive Guidance Notes;
UKAS accreditationsays mustCertification & assessment schemes
The survey, sample collection and sample analysis must be carried by a UKAS accredited contractor in accordance with ISO 17020, ISO 17025 and Health and Safety Executive Guidance Notes;

Matched against the notice text, so this is a floor — the tender pack will demand things the notice never mentions. “Says must” means the quoted sentence itself used obligation language; anything ambiguous is left as a mention.

Buyer intelligence

Make the case to bid

Reveal who to approach at Northern Lighthouse Board, and generate a go-to-market strategy from their news, accounts and people.

Sign up free to unlock buyer intelligence

Free to start. Named contacts come from published notices; the strategy is generated from the buyer’s news, accounts and people.

Source & provenance
OCID
70fd2fab-715b-47d9-9496-070c0a62a5d7
Stage
contract · Contract
Source
Contracts Finder
Buyer ref
BIP863416776
View the original notice on Contracts Finder

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

Market context

Who wins this kind of work

The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.

Top suppliers & buyers in Construction

This view needs WebGL, which this browser has turned off.

Northern Lighthouse Board’s tender network

This view needs WebGL, which this browser has turned off.
Also open now

Similar open tenders

Expression of Interest: Refurbishment and upgrade of Community Hub roof, refurbishment of 2No. toilet blocks and construction of new toilet facilities

Padstow Town Council

Closes 18 Sept 2026Construction
Value not publishedValue

Refurbishment Works to Sumner House WC'S

PROGRESS HOUSING GROUP LIMITED

Closes 5 Oct 2026Construction
£90kValue