LIFECYCLE MANAGEMENT GROUP LIMITED
Inspection, maintenance and reactive repairs for Emergency/Standby Generator Sets
This is a contract result notice, not an open opportunity. Details from the official award data.
The purpose of this contract is to ensure the Client's standby generators are kept in safe and reliable working order.
There are several aspects to the service required a) Routine service/inspection visits - two visits per year per generator is the minimum scope of services required and forms the basis of the fixed contract price. b) Specific service procedures which are not included in the routine visits but are specified by the manufacturer (and/or HTM 06-01) to be undertaken at specific intervals or after a set cumulative run-time of the generator.
Or, as a result of tests or inspection indicating deterioration of parts or fluids.
Examples are oil changes, coolant changes and parts such as filters, hoses, drive belts and batteries which are replaced before they fail as a preventative measure. c) Reactive repairs. d) On occasion the Client requires the option to add intermediate service/inspections between annual service/inspections.
Additional service/inspection visits will be chargeable at agreed rates.
The Contractor's duties will be divided between those which are to be provided in the fixed price, and additional ad-hoc work for which will incur an additional charge.
Ad-hoc work is not guaranteed business.
Maintenance programmes must include a longer test run to establish the generator engine's mechanical performance.
A test to prove the generator engine's condition up to 110% full load should be carried out annually.
The period of the test must last four hours.
What the supplier must deliver
The purpose of this contract is
The purpose of this contract is to ensure the Client's standby generators are kept in safe and reliable working order.
Maintenance programmes must include a longer test
Maintenance programmes must include a longer test run to establish the generator engine's mechanical performance.
A test to prove the generator engine's
A test to prove the generator engine's condition up to 110% full load should be carried out annually.
The period of the test must last
The period of the test must last four hours.
Derived from the notice text — always confirm against the original documents.
Make the case to bid
Reveal who to approach at LIFECYCLE MANAGEMENT GROUP LIMITED, and generate a go-to-market strategy from their news, accounts and people.
Ask me about this tender, the buyer, who wins their work, or whether you should bid.
- OCID
- 99b93047-4736-437b-a24c-e638faca1207
- Stage
- contract · Contract
- Source
- Contracts Finder
- Buyer ref
- LGM32282
Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.
Who wins this kind of work
The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.
Top suppliers & buyers in Repair & Maintenance
LIFECYCLE MANAGEMENT GROUP LIMITED’s tender network
Assembling the network…
Similar open tenders
Statutory Maintenance and Reactive Repairs of Powered Pedestrian Access Doors (including Reactive Repairs to Door Entry and Access Control Systems)
Renfrewshire Council
UKRI-6027 STFC Lifts - Maintenance, Reactive, Remedial and Project works.
UK Research & Innovation (UKRI)