London Gateway - Second Rail Terminal Phase 2

DP World is undertaking the expansion of its London Gateway Port facility at Stanford le Hope, through the development of a new second rail terminal located to the west of the existing eastern operational rail facility. This investment will significantly increase the port's rail freight capacity, improve operational resilience, and support the continued growth of DP Worlds sustainable, low carbon logistics solutions. This expansion represents a strategic enhancement of the port's intermodal capability, enabling faster, more efficient movement of goods across the UK and supporting national objectives for greener freight transport. The new terminal will play a key role in accommodating future demand and maintaining London Gateway's position as a world class logistics and supply chain hub. The Scope of Works covered under this tender include, but are not limited to, the following key elements: Permanent Way Works Construction of new railway infrastructure to serve the second terminal including plain line track, and associated components in a phase installation sequence delivering five new sidings (7 to 11) to compliment the two sidings (12 and 13) already constructed during Phase 1/1A of the works, which are currently in operation. Installation and integration of 21 new switches and crossings (S&C) required to connect the new terminal to the existing rail network corridor as well as providing more route paths for trains entering and exiting the existing eastern rail terminal. Civil Engineering Works Installation of a circa 850m long reinforced concrete crane rail beam with pre-cast concrete pile foundations and its associated mechanical chambers to allow Rail Mounted Gantry Crane (RMGC) operations within the new terminal. Earthworks, formation preparation, track drainage and utility diversions necessary to support the new terminal infrastructure. Construction of numerous ancillary civils foundation bases, walkways, cable routes and under track crossings for the new signalling, telecommunications and electrical plant equipment, shunters cabin and REB building. Telecommunications Works Installation of new and relocation of existing Operational Telecoms and SiSS systems assets including CCTV cameras, signal post and point zone telephones and the shunters panel concentrator. Signaling Works Provision of new and relocation of existing signaling assets, including lineside equipment, control system modifications in the form of new Shunters Cabin housing an updated control panel to operate both rail terminals, and associated REB for the signaling system interlocking. These assets will be constructed in a staged delivery to align with the permanent way phasing, to ensure full operational compatibility. Installation of new signaling track circuits to both the western and eastern terminals will enable operation of both facilities from the one new control panel. Testing, commissioning and integration of all new rail systems with existing operational infrastructure as well as update to the Upminster IECC workstation screens. Electrical and Plant Works New power supplies to the various disciplines line side equipment, shunters cabin and REB, as well as new points heating assets for both the western and existing eastern rail terminal S&C units. Interfaces and Integration Management of all interfaces with existing rail infrastructure, port operations, utilities, and third party stakeholders. Development of staging plans to minimise operational disruption and ensure safe working adjacent to live rail and port environments. Coordination with existing port operations to ensure safe and continuous functionality during construction. Project Goals Upon completion, the new rail terminal will provide; increased rail served capacity for containerised freight, enhanced operational flexibility and resilience, deliver infrastructure capable of supporting robotic next generation RMGC equipment and improved efficiency as well as reduce the ports carbon impact through expanded rail freight capability. Programme: It is intended that the Rail works will commence in July 2026 for a duration of 12 months.

Buyer
LONDON GATEWAY PORT LIMITED
Contract Value
Value not disclosed
Deadline
No deadline set
Published
17 Mar 2026
Interactive

About This LONDON GATEWAY PORT LIMITED Contract

This open tender from LONDON GATEWAY PORT LIMITED was published in 2026. The London Gateway - Second Rail Terminal Phase 2 contract.

This UK government contract opportunity is part of the public procurement process, openly available via Find a Tender.

Contract Analytics

Key Metrics

0Match
0%
Match
50%
Urgency
30%
Value

Sector Distribution

General100%

Contract Timeline

17 Mar

Published

Current

Open for Bids

Value Analysis

Contract value not disclosed

Market Activity

+7%

UK tender activity (12 months)

London Gateway - Second Rail Terminal Phase 2 - Scope of Work

0 phases • 0 requirements • 1 capabilities

Required Capabilities

integration
  • DP World is undertaking the expansion of its London Gateway Port facility at Stanford le Hope, through the development of a new second rail terminal located to the west of the existing eastern operational rail facility. This investment will significantly increase the port's rail freight capacity, improve operational resilience, and support the continued growth of DP Worlds sustainable, low carbon logistics solutions.
  • This expansion represents a strategic enhancement of the port's intermodal capability, enabling faster, more efficient movement of goods across the UK and supporting national objectives for greener freight transport. The new terminal will play a key role in accommodating future demand and maintaining London Gateway's position as a world class logistics and supply chain hub.
  • The Scope of Works covered under this tender include, but are not limited to, the following key elements:
  • Permanent Way Works
  • Construction of new railway infrastructure to serve the second terminal including plain line track, and associated components in a phase installation sequence delivering five new sidings (7 to 11) to compliment the two sidings (12 and 13) already constructed during Phase 1/1A of the works, which are currently in operation. Installation and integration of 21 new switches and crossings (S&C) required to connect the new terminal to the existing rail network corridor as well as providing more route paths for trains entering and exiting the existing eastern rail terminal.
  • Civil Engineering Works
  • Installation of a circa 850m long reinforced concrete crane rail beam with pre-cast concrete pile foundations and its associated mechanical chambers to allow Rail Mounted Gantry Crane (RMGC) operations within the new terminal. Earthworks, formation preparation, track drainage and utility diversions necessary to support the new terminal infrastructure. Construction of numerous ancillary civils foundation bases, walkways, cable routes and under track crossings for the new signalling, telecommunications and electrical plant equipment, shunters cabin and REB building.
  • Telecommunications Works
  • Installation of new and relocation of existing Operational Telecoms and SiSS systems assets including CCTV cameras, signal post and point zone telephones and the shunters panel concentrator.
  • Signaling Works
  • Provision of new and relocation of existing signaling assets, including lineside equipment, control system modifications in the form of new Shunters Cabin housing an updated control panel to operate both rail terminals, and associated REB for the signaling system interlocking. These assets will be constructed in a staged delivery to align with the permanent way phasing, to ensure full operational compatibility. Installation of new signaling track circuits to both the western and eastern terminals will enable operation of both facilities from the one new control panel. Testing, commissioning and integration of all new rail systems with existing operational infrastructure as well as update to the Upminster IECC workstation screens.
  • Electrical and Plant Works
  • New power supplies to the various disciplines line side equipment, shunters cabin and REB, as well as new points heating assets for both the western and existing eastern rail terminal S&C units.
  • Interfaces and Integration
  • Management of all interfaces with existing rail infrastructure, port operations, utilities, and third party stakeholders. Development of staging plans to minimise operational disruption and ensure safe working adjacent to live rail and port environments. Coordination with existing port operations to ensure safe and continuous functionality during construction.
  • Project Goals
  • Upon completion, the new rail terminal will provide; increased rail served capacity for containerised freight, enhanced operational flexibility and resilience, deliver infrastructure capable of supporting robotic next generation RMGC equipment and improved efficiency as well as reduce the ports carbon impact through expanded rail freight capability.
  • Programme: It is intended that the Rail works will commence in July 2026 for a duration of 12 months.

Ask the AI assistant for deeper analysis of this scope

Contract Value

Fixed PriceSingle contract value agreed upfront
Value not disclosed

Key Dates

Important deadlines and milestones

UK Time

Notice Published

Tender opportunity made public on Find a Tender

Tue, 17 Mar 2026
Passed

What This LONDON GATEWAY PORT LIMITED Contract Means

For Citizens

This is a public procurement by LONDON GATEWAY PORT LIMITED. All UK government contracts are publicly accessible for transparency.

For Businesses

This LONDON GATEWAY PORT LIMITED tender is open for bids. Submit your proposal via Find a Tender.

Related Opportunities

Sector Overview

Buyer Network

Your Match Score

Complete your profile for personalized match scoring

Company Match Analysis

Analyze how well this tender matches your company profile and capabilities.

Market Activity

-5%

UK tender activity (12 months)

LONDON GATEWAY PORT LIMITED

Contact Information

View All Contracts
LONDON GATEWAY PORT LIMITED
Spending trends, sector breakdown & more →

Quick Facts

Stage
Tender
Status
active
CPV Codes
0

Reference ID

ocds-h6vhtk-066c43

Win More UK Government Contracts

RFP.quest helps UK businesses find and win public sector tenders. Our AI platform analyzes requirements, identifies gaps, and helps craft winning proposals.

UK tender data from Find a Tender under the Open Government Licence. Powered by RFP.quest.

Tender Assistant

I can help you understand this LONDON GATEWAY PORT LIMITED contract:

• Requirements and evaluation criteria • Risks and gaps analysis • Buyer and market context • Related opportunities

Ask me anything about "London Gateway - Second Rail Terminal Phase 2"!

Powered by CopilotKit