MEDICINES and HEALTHCARE PRODUCTS REGULATORY AGENCY
Modification and installation of control dampers and fumigation dampers
This is a contract result notice, not an open opportunity. Details from the official award data.
This sits in the lower-middle of the Industrial Machinery band — a mid-scale opportunity. Based on 5,734 valued Industrial Machinery tenders in our corpus.
The CL4 facility is one of the most critical areas on site and the HSE carry out audit’s on a regular basis.
It is their recommendation that we ensure that the ETP’s and inner corridors have gas tight dampers so fumigation can take place in case of a spill.
Secondly suite 2 had work done to improve control on pressures and air supply and it is now intended to upgrade Suite 1 to the same level which was also endorsed by the HSE.
Project Objectives To purchase and install the correct fumigation dampers within the ETP’s and inner corridor.
Operation and the function of the dampers to be integrated into the current fumigation system.
This would include specific 13amp sockets etc. and meet the same standard across site.
To modify existing duct work, purchase and install suitable manual CV boxes and upgrade/replace motorised dampers with 110v actuators.
The operation of the dampers to be integrated into our current BMS system and to operate and control as per suite 2.
All new components fitted must be the same make, type and specification as per suite 2.
Commission the pressure system to NIBSC specifications and supply all necessary certification, O&M manuals and up to date drawings.
What the notice asks for
It is their recommendation that we ensure
It is their recommendation that we ensure that the ETP’s and inner corridors have gas tight dampers so fumigation can take place in case of a spill.
Secondly suite 2 had work done
Secondly suite 2 had work done to improve control on pressures and air supply and it is now intended to upgrade Suite 1 to the same level which was also endorsed by the HSE.
Operation and the function of the dampers
Operation and the function of the dampers to be integrated into the current fumigation system.
The operation of the dampers to
The operation of the dampers to be integrated into our current BMS system and to operate and control as per suite 2.
All new components fitted must be
All new components fitted must be the same make, type and specification as per suite 2.
Sentences from the notice that state an obligation, surfaced automatically and shown in the order they appear. Not an exhaustive list — always confirm against the tender documents.
Make the case to bid
Reveal who to approach at MEDICINES and HEALTHCARE PRODUCTS REGULATORY AGENCY, and generate a go-to-market strategy from their news, accounts and people.
Free to start. Named contacts come from published notices; the strategy is generated from the buyer’s news, accounts and people.
- OCID
- c8a096ff-0e1a-4e71-af29-b8211c092b8f
- Stage
- contract · Contract
- Source
- Contracts Finder
- Buyer ref
- ECM-3373
Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.
Who wins this kind of work
The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.
Top suppliers & buyers in Industrial Machinery
MEDICINES and HEALTHCARE PRODUCTS REGULATORY AGENCY’s tender network