Monkton Terrace Footbridge Parapet Replacement and General Maintenance
£396,660 — awarded.
This is a contract result notice, not an open opportunity. Details from the official award data.
This sits in the upper-middle of the Construction band — a substantial contract for the sector. Based on 64,002 valued Construction tenders in our corpus.
The Monkton Terrace Footbridges were constructed in circa 1974.
They comprise two separate structures supporting public footpaths.
Each bridge sits either side of the Network Rail bridge (masonry arch) which carries the main carriageway of Monkton Terrace.
The structures carry pedestrians and cyclists over two railway lines.
The northern line is owned by Network Rail and carries goods traffic to and from the Shell Oil Refinery in Jarrow.
The southern line is owned by Nexus Rail and forms part of the Pelaw to South Shields branch of the Tyne and Wear Metro.
Initial works The following remedial works are proposed prior to commencing works on the East footbridge: o Erect pedestrian diversion signs o Prepare the site compound and secure the site o Ensure that Nexus Metro rail possession and permits are in place Main works The following remedial works are proposed for both of the footbridges: • Install rail protection measures to the footbridge. • Removal of existing parapets and cutting down of the sockets to below the surface of the existing reinforced concrete plinth. • Treating and repair of the voids within the concrete plinth, created from the removal of the parapet. • Extension of the existing concrete plinth (from 200mm to 300mm) to accommodate the new parapet connection details. • Installation of new surface mounted parapets, to both footbridges, which will be drilled and bolted down into the extended reinforced concrete upstand. • The deck waterproofing system, joints and surfacing will also be replaced and repaired as part of these works. • Miscellaneous maintenance repairs. • The works are to be undertaken following the installation of edge protection, which will be undertaken during overnight possessions of the Nexus Rail lines.
Further possessions will be required for: o the re-pointing of the existing abutments and the removal of the edge protection.
What the notice asks for
O Ensure that Nexus Metro rail possession
o Ensure that Nexus Metro rail possession and permits are in place.
Sentences from the notice that state an obligation, surfaced automatically and shown in the order they appear. Not an exhaustive list — always confirm against the tender documents.
Make the case to bid
Reveal who to approach at South Tyneside Council, and generate a go-to-market strategy from their news, accounts and people.
Free to start. Named contacts come from published notices; the strategy is generated from the buyer’s news, accounts and people.
- OCID
- af0d0447-ad3a-49a2-acaa-10805e991987
- Stage
- contract · Contract
- Source
- Contracts Finder
- Buyer ref
- C8135
Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.
Who wins this kind of work
The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.
Top suppliers & buyers in Construction
South Tyneside Council’s tender network
Similar open tenders
The provision of Lift Replacement, Lift Modernisation and ongoing maintenance
London Borough of Sutton
osod Cae 3g newydd yn Ysgol Uwchradd Penarlâg / 3g Pitch Replacement at Hawarden High School
Flintshire County Council