National Museums Liverpool Electrical Installation Condition Report, World Museum
The notice states a rate rather than a total — a contract value is not published.
This is a contract result notice, not an open opportunity. Details from the official award data.
The Estates Department, NML is carrying out a programme of compliance works across the estates portfolio.
This includes for the carrying out of a new Electrical Inspection Condition Report (EICR) at the World Museum, William Brown St, Liverpool L3 8EN.
Bidders are asked to submit a formal submission for the "Electrical Installation Condition Report, World Museum, Liverpool".
The bid submission should show a price per circuit, management cost, costs associated with the provision of access equipment.
The final cost will be based on the number of circuits inspected/tested during the works, as evidenced by the EICR provided.
The last EICR was carried out in 2014 and at that time the building was served by approximately 1,700 protected line circuits from 182 distribution boards (line circuits in this instance is any conductor protected by circuit protective device - single pole/triple pole or three phase).
The works should be carried out in accordance with BS 7671:2018 and Guidance Note 3 of the EIT Wiring Regs and with the requirement being to provide the final, fully signed report in electronic version only, within 7 working days of completion and with identified remedial works clearly highlighted.
Any remedial work identified in the EICR observations will not automatically be awarded directly to the contractor supplying the EICR, however costs for remedial works should also be provided.
Code C1 observations may be remedied, isolated or managed down to C2 where possible immediately at the time of identification (financial limit to be confirmed on award of works).
Contractors should consider the need to carry out the works outside of normal working hours, being completed after 5 pm during normal weekday evenings/overnight.
A schedule of actual hours of working and areas to be covered will need to be agreed in advance of works starting on site.
Site specific RAMs and Method Statements must be submitted prior to commencement of work for approval by NML Health & Safety Advisors, these being coupled with employee training on dynamic risk assessments.
Details of engineers attending site will be required with evidence of their certification/training to show their capability to carry out the works and safely.
Please note, there is a requirement for all engineers to be DBS cleared by the contractor management prior to commencing on site.
What the notice asks for
The bid submission should show a price
The bid submission should show a price per circuit, management cost, costs associated with the provision of access equipment.
The works should be carried out in
The works should be carried out in accordance with BS 7671:2018 and Guidance Note 3 of the EIT Wiring Regs and with the requirement being to provide the final, fully signed report in electronic version only, within 7 working days of completion and with identified remedial works clearly highlighted.
Any remedial work identified in the EICR
Any remedial work identified in the EICR observations will not automatically be awarded directly to the contractor supplying the EICR, however costs for remedial works should also be provided.
Contractors should consider the need to carry
Contractors should consider the need to carry out the works outside of normal working hours, being completed after 5 pm during normal weekday evenings/overnight.
A schedule of actual hours of working
A schedule of actual hours of working and areas to be covered will need to be agreed in advance of works starting on site.
Sentences from the notice that state an obligation, surfaced automatically and shown in the order they appear. Not an exhaustive list — always confirm against the tender documents.
What this notice demands of you
2 named, none in explicit obligation language. Each one is quoted from the notice.
The works should be carried out in accordance with BS 7671:2018 and Guidance Note 3 of the EIT Wiring Regs and with the requirement being to provide the final, fully signed report in electronic version only, within 7 working days of completion and with identified remedial works clearly highlighted.
Please note, there is a requirement for all engineers to be DBS cleared by the contractor management prior to commencing on site.
Matched against the notice text, so this is a floor — the tender pack will demand things the notice never mentions. “Says must” means the quoted sentence itself used obligation language; anything ambiguous is left as a mention.
Make the case to bid
Reveal who to approach at National Museums Liverpool, and generate a go-to-market strategy from their news, accounts and people.
Free to start. Named contacts come from published notices; the strategy is generated from the buyer’s news, accounts and people.
- OCID
- e3dfc910-b27d-4037-9b1f-050df9da96ee
- Stage
- contract · Contract
- Source
- Contracts Finder
- Buyer ref
- National Museums Liverpool Electrical Installation Condition Report, World Museum
Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.
Who wins this kind of work
The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.
Top suppliers & buyers in Electrical Machinery & Apparatus
National Museums Liverpool’s tender network
Similar open tenders
Automatic Fire Detection and Associated Equipment Installation, Maintenance and Reactive Repair at Windsor and London Estates
The Royal Household
PA23 UK4 - Tender notice Framework Agreement for Electrical Spares & Consumables Supplies to British High Commission in New Delhi
Foreign, Commonwealth and Development Office