Wiltshire Council

HE0914 A350 Chippenham Duelling Scheme April 2023

ConstructionCPV 45233121
ValueValue not published
Awarded
Published30 Apr 2025
RegionNationwide
Outcome — awarded
MJ Church (Plant) Ltd

This is a contract result notice, not an open opportunity. Details from the official award data.

Who to contact
Mr Dave Gillett
david.gillett@wiltshire.gov.uk
+44 1255713371

The procurement contact named on the official notice.

The brief

he A350 is one of the most important routes in Wiltshire.

It is a primary north-south route with regional significance connecting the south coast with the M4 and onwards to Bristol and the Midlands.

In Wiltshire it passes around the principal settlements of Chippenham and Trowbridge via the town of Melksham and on to Westbury and Warminster.

It has been a longstanding priority to improve north-south connectivity along the A350, and Wiltshire Council has been progressively bringing forward the dualling of the A350 Chippenham bypass.

Over recent years three major capital schemes (Phases 1, 2 and 3) have been brought forward to improve capacity and safety on the route, largely funded through successful Department for Transport (DfT) and/or Local Enterprise Partnerships (LEP) funding bids.

Most recently, an Outline Business Case (OBC) bid was made to DfT for funding to bring forward a scheme to complete the dualling of the A350 bypass at Chippenham.

In the spending review in October 2021 the government announced that it would allocate funds for a scheme to dual the remaining single carriageway sections of the A350 route round Chippenham.

The project was also included within the list of forthcoming infrastructure projects as part of The Growth Plan 2022 published in September 2022.

Wiltshire Council and its consultants Atkins are now pressing forward to complete the design of the remaining Phases 4 and 5 of the scheme, and preparing the Full Business Case (FBC).

Subject to the FBC being approved by the DfT, it is anticipated that construction works will be undertaken during 2024 and 2025.

The scheme is likely to include for the following key elements Phase 4 dualling: widening the A350 over a total distance of some 1.5km to dual 2-lane between Chequers roundabout and Lackham roundabout.

The dualling would take place within the existing wide highway verge to the west of the current carriageway.

Phase 5 dualling: widening the A350 over a total distance of some 1.75km to dual 2-lane between Cepen Park South roundabout and Bumpers Farm roundabout.

Again, the dualling would take place within the existing wide highway verge to the west of the current carriageway.

When implemented with Phase 4, this would extend the dualling to cover the full stretch of the A350 Chippenham Bypass.

Bumpers Farm Roundabout capacity enhancements: increasing the circulatory from 2 lanes to 3; signalising 4 approach arms; increasing approach arms from A350 (S), A420 (W), A350 (N) and A420 (E) to 3 lanes; and dualling the exits onto the A420 (E) and A420 (W) and Lackham roundabout capacity enhancements: dualling the exit to the A350 north as part of the phase 4 works.

The works will be designed and built-in accordance with current standards and guidelines and will include for all key aspects of highway construction – earthworks, carriageway, footways, drainage, street lighting, signage, statutory authority (gas, water electric etc) service diversions and provision, and hard and soft landscaping works.

The works will be contained within the existing highway boundary extents and there should be no requirement for additional land.

The existing bridges along this route were constructed to accommodate the additional carriageways without needing further major works, and as such there are no major structural works anticipated.

The A350 route will need to remain in operation throughout the works, and as such careful traffic management considerations and phasing, particularly in connection with the Bumpers Farm Roundabout enhancements, will be required.

There will be a desire to minimise impacts on traffic flows during the works and ensure that the scheme is undertaken with suitable and appropriate levels of public engagement and liaison.

Requirements

What the notice asks for

01

The works will be contained within

The works will be contained within the existing highway boundary extents and there should be no requirement for additional land.

02

The A350 route will need to remain

The A350 route will need to remain in operation throughout the works, and as such careful traffic management considerations and phasing, particularly in connection with the Bumpers Farm Roundabout enhancements, will be required.

03

There will be a desire to minimise

There will be a desire to minimise impacts on traffic flows during the works and ensure that the scheme is undertaken with suitable and appropriate levels of public engagement and liaison.

Sentences from the notice that state an obligation, surfaced automatically and shown in the order they appear. Not an exhaustive list — always confirm against the tender documents.

Buyer intelligence

Make the case to bid

Reveal who to approach at Wiltshire Council, and generate a go-to-market strategy from their news, accounts and people.

Sign up free to unlock buyer intelligence

Free to start. Named contacts come from published notices; the strategy is generated from the buyer’s news, accounts and people.

Source & provenance
OCID
ocds-h6vhtk-037589
Stage
award · Awarded
Source
Find a Tender
Buyer ref
018102-2025
View the original notice on Find a Tender

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

Market context

Who wins this kind of work

The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.

Top suppliers & buyers in Construction

This view needs WebGL, which this browser has turned off.

Wiltshire Council’s tender network

This view needs WebGL, which this browser has turned off.
Also open now

Similar open tenders

Wayfinding Scheme in the Witney Area

West Oxfordshire District Council

Closes 14 Sept 2026Construction
£65kValue

Servicing and Response Maintenance of Kitchen Catering Equipment - April 2027 - March 2031

Borough of Telford & Wrekin

Closes 23 Sept 2026Construction
£400kValue