The brief

The Contractor shall provide the following service to the Client: [1 x Volvo L90H] Loading Bucket Tip of lip bucket 4.5m capacity with trash guard RUBBER BLADE 48" - Medium 911M 1" Lock Washers - Medium Blade (qty: 13) PLOUGH BOLT 1 x 4 (qty:13) PLOUGH NUT 1 " (qty: 13) Windscreen Cage Protection to fully protect the operator from debris falling from the bucket whilst maintaining maximum all round visibility.

Roll Over Protective Structures (ROPS) & Falling Object Protective Structure (FOPS) sound insulated safety care cab with environmental controls.

All Cabs to be fitted with Air Conditioning.

Air Pre-Cleaner to deal with dusty environment.

Reversing Camera Amber warning beacon, audible reversing warning and standard reversing lights, red seat belts.

Guarantee that plant supplied will be able to run on solid TY cushion tyres and without detriment to the plant or operator.

Auto-lube on board dispenser for difficult to access greasing points, manual lubrication to ground standing operator greasing points.

Automated engine cut off that shall activate with warning if plant is left in idle mode duration for longer than 3 minutes.

Additional guarding around hydraulic hoses to minimise risk and wear and tear when in contact with waste.

Reduced emissions (compliant with all current and planned legislation regarding emission control) - Euro 6 engines Fire Suppression System Plant Tracking System Load weighing systems to be installed on loading bucket to weigh material being loaded into hoppers or vehicles/containers.

Hydraulic isolator switch to ensure complete shut down of plant in an emergency.

Additional brush attachment option included required.

1 x Volvo L70 H Loading Bucket Tip of lip bucket 4.5m capacity with trash guard RUBBER BLADE 48" - Medium 911M 1" Lock Washers - Medium Blade (qty: 13) PLOUGH BOLT 1 x 4 (qty:13) PLOUGH NUT 1 " (qty: 13) Windscreen Cage Protection to fully protect the operator from debris falling from the bucket whilst maintaining maximum all round visibility.

Roll Over Protective Structures (ROPS) & Falling Object Protective Structure (FOPS) sound insulated safety care cab with environmental controls.

All Cabs to be fitted with Air Conditioning Air Pre-Cleaner to deal with dusty environment.

Reversing Camera Amber warning beacon, audible reversing warning and standard reversing lights, red seat belts.

Automated engine cut off that shall activate with warning if plant is left in idle mode duration for longer than 3 minutes.

Additional guarding around hydraulic hoses to minimise risk and wear and tear when in contact with waste.

Reduced emissions (compliant with all current and planned legislation regarding emission control) - Euro 6 engines Guarantee that plant supplied will be able to run on solid TY cushion tyres and without detriment to the plant or operator.

Auto-lube on board dispenser for difficult to access greasing points, manual lubrication to ground standing operator greasing points.

Fire Suppression System Plant Tracking System Load weighing systems to be installed on loading bucket to weigh material being loaded into hoppers or vehicles/containers.

Hydraulic isolator switch to ensure complete shut down of plant in an emergency.

1 x JCB 3CX/JCB 4CX/JCB 5CX Amber warning beacon, audible reversing warning and standard reversing lights.

Front mounted bucket - 1 piece 50mm wear edge Front solid tyres Fire Suppression System Plant Tracking System Windscreen Cage Protection to fully protect the operator from debris falling from the bucket whilst maintaining maximum all round visibility.

Isolator or emergency stop switch to ensure complete shut down of plant in an emergency.

Reduced emissions (compliant with all current and planned legislation regarding emission control) - Euro 6 engines Automated engine cut off that shall activate with warning if plant is left in idle mode duration for longer than 3 minutes.

All Cabs to be fitted with Air Conditioning Air Pre-Cleaner to deal with dusty environment.

Reversing Camera Additional guarding around hydraulic hoses to minimise risk and wear and tear when in contact with waste.

All Cabs to be fitted with Air Conditioning.

Rear Selector Grab Attachment required for sorting recyclable materials such as metal, wood, mattresses.

The Collection Point/Affected Property/Treatment Site The Affected Property operates 7 x days a week.

Operating hours are: Mon 07:00am-00:00 Tues-Sat 07:00am-23:30 Sunday 08:00am-17:00 Closed only Christmas Day & New Years Day Frequency of Collection/Service/Testing The Contractor shall provide a fully inclusive repairs and maintenance package within the base price to include collection charges and costs.

The Contractor shall guarantee that in the event of plant and equipment failure not caused by the Operator or their agents or in excess of 24 hours, the Contractor shall undertake to supply an equivalent plant at their own cost.

In the event that the Contractor is not able to supply a replacement within the agreed timeframe the Company may seek to replace with another hired plant.

The contractor shall reimburse the Company the full cost of replacement and shall include any transportation costs incurred as a result of this.

All plant and equipment shall hold a minimum of 12-month warranty.

The Contractor is to ensure that in the event of any breakdowns (within the company's operating hours) a qualified engineer shall be sent out to site to rectify within 2 hours from notification, to investigate and or remedy the fault and or supply replacement plant.

All parts failing due to general and expected wear and tear are to be replaced the Contractor at their cost.

The Contractor will produce a list of parts and components which will fall within this category and are exempt within 1 month of the contract commencing.

All servicing is to be carried out in accordance with manufacturer's guidance and to the manufacturer's minimum recommended specifications.

Copies of all service records and annual inspections will be supplied to the company within 7 working days of all works being completed and retained by the Contractor for a period of 3 years from the expiry of agreement.

Upon completion of any and all servicing, maintenance and or repair works the Contractors engineer must supply a signed handover document which states what work has been undertaken and that the plant is now safe, fit for use, fully serviceable and meets all Health & Safety requirements e.g.

LOLER or PUWER certification has been issued.

Costs for all part, labour and travel through wear and tear are to be included.

Solid tyres are to be supplied to begin with as a one of and thereafter will be replaced/repaired by the Company.

Requirements

What the notice asks for

01

The Contractor shall provide the following service

The Contractor shall provide the following service to the Client:.

02

Guarantee that plant supplied will be able

Guarantee that plant supplied will be able to run on solid TY cushion tyres and without detriment to the plant or operator.

03

Automated engine cut off that shall activate

Automated engine cut off that shall activate with warning if plant is left in idle mode duration for longer than 3 minutes.

04

Hydraulic isolator switch to ensure complete shut

Hydraulic isolator switch to ensure complete shut down of plant in an emergency.

05

Isolator or emergency stop switch to ensure

Isolator or emergency stop switch to ensure complete shut down of plant in an emergency.

Sentences from the notice that state an obligation, surfaced automatically and shown in the order they appear. Not an exhaustive list — always confirm against the tender documents.

Buyer intelligence

Make the case to bid

Reveal who to approach at LONDONENERGY LTD, and generate a go-to-market strategy from their news, accounts and people.

Sign up free to unlock buyer intelligence

Free to start. Named contacts come from published notices; the strategy is generated from the buyer’s news, accounts and people.

Source & provenance
OCID
ocds-h6vhtk-04fc73
Stage
award · Awarded
Source
Find a Tender
Buyer ref
035558-2025
View the original notice on Find a Tender

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

Market context

Who wins this kind of work

The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.

Top suppliers & buyers in Industrial Machinery

This view needs WebGL, which this browser has turned off.

LONDONENERGY LTD’s tender network

This view needs WebGL, which this browser has turned off.
Also open now

Similar open tenders

Provision and maintenance of mobile plant

Yorwaste Ltd

Closes 30 Sept 2030Construction Machinery
£3.0mValue

Sewerage Treatment, Plant and Pumping Station Mechanical and Electrical Service

Gedling Borough Council

Closes 5 Oct 2026Construction
Value not publishedValue