Following the identification of High risk RAAC within the Mansard extension (the 2nd floor) of the Town Hall, as classified under the IstructE (Institution of Structural Engineers) guidance, the second floor was isolated from use.
To further support an evaluation of risk a series of internal investigations have then been undertaken to identify the implications of a single and multiple RAAC collapse.
The findings of the investigation confirm that the current floor construction (the roof of the original 1930's building) was never designed to accommodate dynamic loads resulting from a panel failure of this magnitude.
The RAAC panels in question span significant distances and are of considerable mass; should one or more panels fail without warning, which is the nature of RAAC, the resulting impact load could therefore exceed the second floor's load-bearing limits causing the floor structure to fail.
This could lead to a cascading effect to the floors below.
These findings necessitate risk mitigation measures to prevent any potential structural failures and ensure the safety of the building occupants below this area.
What the supplier must deliver
To further support an evaluation of risk
To further support an evaluation of risk a series of internal investigations have then been undertaken to identify the implications of a single and multiple RAAC collapse.
The RAAC panels in question span significant
The RAAC panels in question span significant distances and are of considerable mass; should one or more panels fail without warning, which is the nature of RAAC, the resulting impact load could therefore exceed the second floor's load-bearing limits causing the floor structure to fail.
These findings necessitate risk mitigation measures
These findings necessitate risk mitigation measures to prevent any potential structural failures and ensure the safety of the building occupants below this area.
Derived from the notice text — always confirm against the original documents.
Make the case to bid
Reveal who to approach at Peterborough City Council, and generate a go-to-market strategy from their news, accounts and people.
Ask me about this tender, the buyer, who wins their work, or whether you should bid.
- OCID
- ocds-h6vhtk-0569b9
- Stage
- award · Awarded
- Source
- Find a Tender
- Buyer ref
- 044560-2025
Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.
Who wins this kind of work
The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.
Peterborough City Council’s tender network
Assembling the network…