Harwich Office Upgrades - HVAC
The procurement contact named on the official notice.
Trinity House have HVAC systems installed in two buildings, known as the main office (3 floors) and buoy yard (2 floors), at their Harwich site.
These systems have been operational since 2006 and are maintained on a regular basis.
The system consists of a mix of floor wide arrangements with fan coil units in the roof space as well as dedicated room based independent units.
All items are from the Daikin range and can be centrally controlled and configured via a portal.
These works are for the supply of all the necessary equipment on a like-for-like basis to meet the original building performance (cooling / heating) of all the HVAC systems across two buildings, excluding the two IT server rooms.
In addition, all equipment is to be installed, with full co-ordination, noting the need to maintain the working office environment.
This will need the full management, installation, and configuration of the systems, with an acceptance test, as well as training on supervisory local and remote platforms.
Some of the goals: Undertake the necessary role for CDM Peformance efficiency improvement with a heating SCOP of 5.5 and cooling SEER of 7.5.
Improvement in temperature control with a ±1°C deadband Identical level of redundancy Cyber security assessment and mitigation provided Timescales Hardware delivery – by end March 2026 Installation – May to Oct 2026 Commissioning – May to Oct 2026 Customer acceptance testing – Nov 2026 For more information about this opportunity, please visit the Delta eSourcing portal at: https://trinityhouse.delta-esourcing.com/tenders/UK-UK-LONDON:-Heating%2C-ventilation-and-air-conditioning-installation-work./P8K79HYZ2N To respond to this opportunity, please click here: https://trinityhouse.delta-esourcing.com/respond/P8K79HYZ2N
What the supplier must deliver
These works are for the supply
These works are for the supply of all the necessary equipment on a like-for-like basis to meet the original building performance (cooling / heating) of all the HVAC systems across two buildings, excluding the two IT server rooms.
In addition, all equipment is to
In addition, all equipment is to be installed, with full co-ordination, noting the need to maintain the working office environment.
Derived from the notice text — always confirm against the original documents.
Skills, tools & certifications
Detected from the notice — the capabilities and credentials this bid calls for. Click one to see who wins that work.
Make the case to bid
Reveal who to approach at Trinity House, and generate a go-to-market strategy from their news, accounts and people.
- OCID
- ocds-h6vhtk-05e478
- Stage
- planning · Planning
- Source
- Find a Tender
- Buyer ref
- 075257-2025
Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.
Who wins this kind of work
The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.
Top suppliers & buyers in Construction
Assembling the market network…
Trinity House’s tender network
Assembling the network…