RFP QuestBeta
Awarded · ResultStage · award

The Tall Ship Glenlee Trust

REPLACEMENT DISABLED ACCESS LIFT FOR SV GLENLEE (THE TALL SHIP GLENLEE)

Industrial MachineryCPV 42416120
ValueValue not published
Awarded
Published10 Feb 2026
RegionNationwide
Outcome — awarded
Saltire Lifts LTD

This is a contract result notice, not an open opportunity. Details from the official award data.

Who to contact
Fiona Greer
fiona.greer@thetallship.com
+44 1413573699

The procurement contact named on the official notice.

The brief

The historic vessel, The Tall Ship Glenlee requires a replacement accessibility lift to be purchased and installed using funds from Museums Galleries Scotland Repair and Adaptation Fund.

Contractor turnkey project requirement definition:- 1.

Lift as presently configured with four access/ egress levels in weather deckhouse, ‘tween decks, mezzanine deck, hold, DDA compliant.

2.

Platform lift capable of carrying a minimum load of 450kg and have a capacity alternatively for 5 persons.

3.

Power – single phase 220 V AC.

4.

Capable of operation in up to 2 degrees of ship list and 1 degree change of fore and aft trim of ship.

5.

Does not need to meet fire evacuation requirements.

6.

Design must accommodate the limited pit depth of <150mm.

7.

Meet or exceed 2006/42CE.

8.

All works must comply with CDM regs.

9.

Lift must be capable of a minimum of 20 operational cycles per hour.

10.

Normal duty cycle is 8 hours per day with some operational days of up to 24 hours per day.

11.

A five-year warranty on all parts and labour/ hours is required.

12.

A five-year maintenance package is required.

13.

A key control is required to avoid unauthorised operations.

14.

Turnkey project for removal of all components of old lift installation and installation and commissioning of new lift.

15.

All responsibility for measurements, design, removal of old equipment and materials arisings from site.

16.

All transportation of equipment and materials, lifting and craneage are part of the turnkey contract.

17.

All works must comply with relevant Health and Safety at Work Act requirements.

18.

Insurance must be provided for a sum of GBP 10 million pounds for any one occurrence.

19.

Product liability insurance in the sum of GBP 10 million pounds in the aggregate and professional indemnity insurance in the aggregate.

Client site works: - Works on essential support steel substructures for lift in lower hull steelwork blasting inspection, any necessary strengthening and protective coating whilst old lift removed must be completed before new lift installation.

Key requirements

What the supplier must deliver

01

Platform lift capable of carrying a minimum

Platform lift capable of carrying a minimum load of 450kg and have a capacity alternatively for 5 persons.

02

Capable of operation in up to 2

Capable of operation in up to 2 degrees of ship list and 1 degree change of fore and aft trim of ship.

03

Does not need to meet fire evacuation

Does not need to meet fire evacuation requirements.

04

Design must accommodate the limited pit depth

Design must accommodate the limited pit depth of <150mm.

05

All works must comply with CDM regs

All works must comply with CDM regs.

Derived from the notice text — always confirm against the original documents.

Buyer intelligence

Make the case to bid

Reveal who to approach at The Tall Ship Glenlee Trust, and generate a go-to-market strategy from their news, accounts and people.

Source & provenance
OCID
ocds-h6vhtk-05f7ca
Stage
award · Awarded
Source
Find a Tender
Buyer ref
011908-2026
View the original notice on Find a Tender

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

Market context

Who wins this kind of work

The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.

Top suppliers & buyers in Industrial Machinery

Scroll to explore the market network

The Tall Ship Glenlee Trust’s tender network

Assembling the network…

Also open now

Similar open tenders

Lift Modernisation Works - 2026 to 2036

Southern Housing

Closes 3 Aug 2026Construction
£86.0mValue

EFRP - Train Lifting Jacks for New Enterprise Trains

Translink

Closes 17 Sept 2026Industrial Machinery
£1.2mValue