FIRE WATER PUMP REPLACEMENT

ConstructionCPV 45220000
ValueValue not published
Deadline
Published20 Jan 2026
RegionNationwide
Who to contact
Procurement@londonenergyltd.com

The procurement contact named on the official notice.

Match for your company
Sign up free to see how well this tender matches your company — the score, the signals that align, and where the gaps are.
The brief

A) Introduction LondonEnergy Ltd (The Company) own and operate the EcoPark Energy Centre located in Edmonton, London.

The Energy Centre has five boilers burning approximately 500,000 tonnes of domestic refuse per year in a continuous 24-hour operation, 7 days per week.

The waste is delivered by road via the weighbridges/gate house by various types of transport.

The waste is tipped and held in storage bunkers.

Waste is fed by three 5m3 grabbing cranes from the storage bunkers to the feed chutes of each boiler.

Each of the water tube boilers is operated to achieve an evaporation rate of 40 tonnes per hour, at a steam pressure of 41.5 Bar and temperature of 415 OC.

Material which remains after the incineration process is transferred to the residual conveyors for onward transfer for further treatment and recycling.

Within the EcoPark, there is a firewater ring main system consisting of: 1) 2 x Firewater Pumps 2) 1 x Sprinkler Header with level control (float switch start) 3) 1 x Fire Water Ring Main (with pressure-controlled start capability) 4) 40 x Isolation Valves 5) 18 x Fire Hose Points 6) 18 x Fire Hose Connections 7) 20 x Fire Hydrants 8) 1 x Crossover Pipeline (for pressure compensation - to be decommissioned and replaced with the jockey pump) The Eco Park Firewater Pump Project aims to install two new diesel firewater pumps and integrate them with the London Energy DCS system.

This will enhance the control, monitoring, and visibility of the fire protection system compared to the currently installed setup.

Additionally, a new jockey pump will replace the existing crossover system to maintain pressure in the Firewater Ring Main.

In addition to the installation of two new firewater pumps and a jockey pump, this project requires enhanced visual, audible, and control capabilities.

All components and alarms must be integrated with the SCADA system, ensuring seamless monitoring and control.

Key requirements

What the supplier must deliver

01

The Eco Park Firewater Pump Project aims

The Eco Park Firewater Pump Project aims to install two new diesel firewater pumps and integrate them with the London Energy DCS system.

02

Additionally, a new jockey pump will replace

Additionally, a new jockey pump will replace the existing crossover system to maintain pressure in the Firewater Ring Main.

03

All components and alarms must be integrated

All components and alarms must be integrated with the SCADA system, ensuring seamless monitoring and control.

Derived from the notice text — always confirm against the original documents.

Buyer intelligence

Make the case to bid

Reveal who to approach at LONDONENERGY LTD, and generate a go-to-market strategy from their news, accounts and people.

Source & provenance
OCID
ocds-h6vhtk-060962
Stage
planning · Planning
Source
Find a Tender
Buyer ref
004589-2026
View the original notice on Find a Tender

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

Market context

Who wins this kind of work

The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.

Top suppliers & buyers in Construction

Assembling the market network…

LONDONENERGY LTD’s tender network

Assembling the network…

Also open now

Similar open tenders

Provision of replacement Crane Gantry Cabs

LONDONENERGY LTD

Closes 27 Jul 2026Construction
£300kValue

Boiler and Domestic Hot Water Replacements at Fallings Park Fire Station and Walsall Fire Station

West Midlands Fire and Rescue Authority

Closes 24 Jul 2026Construction
Value not publishedValue