The Mayor and Commonalty and Citizens of the City of London

Guildhall - Great Hall Roof H&S Works

ConstructionCPV 45260000
Value£2.7m
Deadline5 Aug 2026
Published8 Jul 2026
RegionNationwide
Timeline
Published 8 Jul 202622 days leftCloses 5 Aug 2026
Who to contact
Hirdial Singh Rai
hirdial.rai@cityoflondon.gov.uk
020 7606 3030

The procurement contact named on the official notice.

Contract value in context
£2.7mtotal contract value
median £158k
this tender£0£6.5m

This is a large award for Construction — above three-quarters of comparable contracts. Based on 64,002 valued Construction tenders in our corpus.

Match for your company
Sign up free to see how well this tender matches your company — the score, the signals that align, and where the gaps are.
The brief

About the Project The proposed works are comprised of high-level repairs to the Great Hall roof, to include: • Refurbishment of the central lantern and fleche • Isolated repairs on the Collyweston stone slate roof • Repairs and improvements to rainwater discharge • High-level masonry repairs and cleaning, to include clerestories, parapets, turrets, pinnacles and tracery • turrets, pinnacles and tracery • Re-bedding of gable copings with improved details • Installation of a new weathervane on the fleche The Great Hall and the wider Guildhall complex will remain operational throughout the works.

The contractor’s compound will be located on the large, paved area immediately north of the Old Library.

The Great Hall is enclosed by ambulatories on all sides, which prevents the use of full-height, ground-supported scaffolding.

Consequently, scaffolding to the north and south elevations will need to be cradled from parapet level, while access to the east and west gables will require bridging over the ambulatories and bearing onto adjacent structures.

An indicative scaffolding design and methodology have been developed and will be included within the tender documentation.

The Contractor is anticipated to take possession of the site in early October 2026.

Works to the lantern and south elevation of the Great Hall must be completed no later than late October 2027, in advance of the annual Lord Mayor’s Show.

About the Great Hall London’s Guildhall has been at the heart of the City’s government for centuries.

The site has been a centre of civic administration since at least the 12th century, although there is evidence that a guildhall or meeting place has existed on the site as early as the Saxon period.

It was built on the site of a Roman amphitheatre which dates to 70 AD, the remains of which were rediscovered in 1987, during the construction of the adjacent art gallery, and are on public display in the gallery’s purpose-built basement display.

The medieval Guildhall was erected between 1411 and 1440 to serve as the administrative and ceremonial centre of the City of London.

It was built in Perpendicular Gothic style, to the designs of John Croxton, the master mason responsible for the structure’s grand stonework.

After the Great Fire of London (1666) destroyed the roof, Sir Christopher Wren and Robert Hooke oversaw repairs, replacing the fire damaged roof and altering the interior.

The next phase of alterations occurred between 1788-91 under the auspices of George Dance the Younger, who redesigned the interior and introduced the building’s striking neoclassical porch.

Dance also designed a new façade for the Guildhall Chapel, which was demolished in 1822 to make way for the Mayor’s and City of London Court.

In 1866-70 Sir Horace Jones undertook major works to restore many of the building’s lost Gothic elements.

The building suffered extensive damage during the Second World War Blitz and restoration work was completed in the 1950s under the direction of Sir Giles Gilbert Scott.

Today the Guildhall is a blend of medieval, Georgian, Victorian and post-war architecture, reflecting its long and dynamic history, and the building remains the ceremonial and administrative centre of the City of London Corporation.

This procurement will be conducted as a two-stage competitive process for the award of a below-threshold contract under the Procurement Act 2023.

The process has been designed as a proportionate competition comprising an initial selection and shortlisting stage followed by an invitation to tender issued to shortlisted suppliers" This Selection stage tender process will shortlist maximum of six supplers which will be taken foirward to the ITT Stage.

Key requirements

What the supplier must deliver

01

Consequently, scaffolding to the north and south

Consequently, scaffolding to the north and south elevations will need to be cradled from parapet level, while access to the east and west gables will require bridging over the ambulatories and bearing onto adjacent structures.

02

Works to the lantern and south elevation

Works to the lantern and south elevation of the Great Hall must be completed no later than late October 2027, in advance of the annual Lord Mayor’s Show.

03

Responsible for the structure’s grand stonework

responsible for the structure’s grand stonework.

Derived from the notice text — always confirm against the original documents.

Buyer intelligence

Make the case to bid

Reveal who to approach at The Mayor and Commonalty and Citizens of the City of London, and generate a go-to-market strategy from their news, accounts and people.

Source & provenance
OCID
ocds-h6vhtk-06538e
Stage
tender · Open
Source
Find a Tender
Buyer ref
064363-2026
View the original notice on Find a Tender

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

Market context

Who wins this kind of work

The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.

Top suppliers & buyers in Construction

Assembling the market network…

The Mayor and Commonalty and Citizens of the City of London’s tender network

Assembling the network…

Also open now

Similar open tenders

PENLEE HOUSE GALLERY & MUSEUM ROOF REPAIR WORKS

Penzance Town Council

Closes 11 Aug 2026Construction
£105kValue

External Re-rendering Works – Trebanos Community Hall (Subject to Grant Funding)

Pontardawe Town Council

Closes 2 Aug 2026Construction
£30kValue