CAS-01248-P6T5Z5 - MAIN BLOCK 1 – 10 Hatherden Court Andover SP10 1HS - Flat Roof Renewal
£83,145 — awarded.
This is a contract result notice, not an open opportunity. Details from the official award data.
The procurement contact named on the official notice.
This sits in the lower-middle of the Construction band — a mid-scale opportunity. Based on 64,002 valued Construction tenders in our corpus.
Project: The refurbishment of the main roof NB: All roofing work to be carried out by an NFRC and Garland accredited contractor & must be able to self-certify via the competent roofing scheme or Principal contractor to arrange and pay for a Building Control inspection.
As part of contractor pre-survey, contractor should identity and protect any soil vent pipes and internals gutters.
It is the contractors responsibility to identify any dilapidations of the block façade and the surrounding area (e.g broken curbs, bollards and existing cut up grass) Erect tubular steel scaffolding with required lifts to such elevations, including suitable access for the fascia work.
Contractor to risk assess material up, waste down to/from work area, including operatives.
All scaffolding to be measured against the face of the building and to include the lift heights for a specific work type and trade.
Remove existing roof covering and safely lower to ground level and remove from site.
Contractor to ensure the internal gutters are protected when removing roof covering.
Install new roof (and associated works) as per Garland technical specification document dated 25/09/25 Material and debris will be removed from site The contractor is to leave the properties and surrounding areas etc clean and clear to original condition.
Wash down windows, doors, and existing/new PVCu Fascia's/soffits on completion to remove dirt & debris caused by roofing works.
On completion contractor to arrange CCTV of internal gutters from 1st manhole to establish that they are clear of debris before and after roof works.
What the notice asks for
NB: All roofing work to be carried
NB: All roofing work to be carried out by an NFRC and Garland accredited contractor & must be able to self-certify via the competent roofing scheme or Principal contractor to arrange and pay for a Building Control inspection.
As part of contractor pre-survey, contractor should
As part of contractor pre-survey, contractor should identity and protect any soil vent pipes and internals gutters.
Contractor to ensure the internal gutters are
Contractor to ensure the internal gutters are protected when removing roof covering.
Sentences from the notice that state an obligation, surfaced automatically and shown in the order they appear. Not an exhaustive list — always confirm against the tender documents.
Make the case to bid
Reveal who to approach at ASTER GROUP LIMITED, and generate a go-to-market strategy from their news, accounts and people.
Free to start. Named contacts come from published notices; the strategy is generated from the buyer’s news, accounts and people.
- OCID
- ocds-h6vhtk-0662f2
- Stage
- award · Awarded
- Source
- Find a Tender
- Buyer ref
- 019878-2026
Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.
Who wins this kind of work
The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.
Top suppliers & buyers in Construction
ASTER GROUP LIMITED’s tender network