Refurbishment and Upgrade of Calf of Eday Lighthouse

Description of Works The Site Location: Calf of Eday Minor Light is situated on the small island of Eday, to the Northeast of mainland Orkney (Latitude 59o 14.2’ N, Longitude 2o 45.7’ W). Lighthouse Site: Access to the site is through an agreed right of access with the owner of Carrick Farm, Eday. This consists of a rough footpath through grazing fields (pasture and rough grazing), approx. 870m in length. The topography is relatively flat, with some sections of steeper ground across small burns. There are steep cliffs immediately to the seaward side of the access track. On the landward side of the site, there is a small solar array bounded by a post and wire fence, and a set of concrete steps with galvanised steel handrail down to the lighthouse access walkway. This walkway itself is formed of galvanised steel which sits on stone piers. The lighthouse itself is built on a concrete base within the intertidal zone and sits approximately 18.0m out from high tide level. This project is to refurbish the lighthouse structure including replacement of the existing access ladder, balcony and lightroom with GRP equivalent, and full electrical re-work. There are minor repairs required to the existing access walkway and solar array. Site Access Due to the location of this site, the majority of materials and equipment will be transported to and from site via NLB Ship and Helicopter. See sections of NLB Helicopter manual for details of working with the helicopter included as an Appendix to the tender documents. There will additionally be a requirement to bring some sections of the new lightroom to site using a ‘multicat’ style low draught vessel with crane attachment. The site can be accessed by boat, subject to local weather conditions, and on foot, as above. An agreement may be reached with the landowner regarding access through their fields using small ATVs, but this is not currently in place. The Principal Contractor must also ensure that the condition of any access routes are monitored and any areas identified as hazardous are noted with details passed to their own employees, appointed sub-contractors, and all visiting NLB personnel. If necessary, suitable remedial and protective measures should be put in place to protect anyone on the site and the environment for the duration of the contract. All materials for site establishment to be delivered to NLB Oban no later than 17 April 2026. NLV Pharos and NLB Helicopter to deliver materials to site starting 28 April 2026, with block ending 3 May 2026, latest. A mid-visit by NLV Pharos and NLB Helicopter is scheduled for 28-30 June 2026, inclusive. Project works to be completed ahead of scheduled clearance by NLV Pharos and NLB Helicopter 29 August to 1 September 2026, inclusive. Main elements of project as follows: •Carry out full asbestos survey of buildings where work will take place •Delivery of all plant/materials to site, and establish site •Establishment of site camp, to include welfare and accommodation for site staff for duration of the project •Erection of scaffolding or other suitable access to allow for works to existing lightroom •Demolition and removal from site of existing lightroom, balcony and access ladder •Template made of existing fixing holes in top of octagonal tower section •Fabrication, delivery to site (using multicat vessel or other suitable means) and install of new GRP lightroom, aluminium balcony and access ladder •Full electrical strip, including optic and solar panels, and install of new system •Full internal and external redecoration of the tower, including removal of lightning conductor system •Works to upgrade access bridge, including replacement of cross beams where corroded, infill of voids on masonry piers and replacement of some handrail elements •Rewire of solar array boundary fence •Demobilisation Programme All contractors must submit a detailed works programme, at tender stage, with a proposed work commencement date on site of 28 April 2026. We require flexibility on the programme to be able to cope with many variables including tides, weather etc. On award we agree a final programme of works. It is important that Tenderers or their representative(s) attend the site visit, any Tenderers submitting a tender that have not attended the site visit, will not be considered. Site visits will be conducted on Wednesday 11 February 2026. Please request a site visit via Delta eSourcing attendance and names, mobile numbers of representatives attending site.

Buyer
Northern Lighthouse Board
Contract Value
Value not disclosed
Deadline
No deadline set
Published
13 Mar 2026
Interactive

About This Northern Lighthouse Board Contract

This award stage contract from Northern Lighthouse Board was published in 2026. The Refurbishment and Upgrade of Calf of Eday Lighthouse contract.

This UK government contract opportunity is part of the public procurement process, openly available via Find a Tender.

Contract Analytics

Key Metrics

0Match
0%
Match
50%
Urgency
30%
Value

Sector Distribution

General100%

Contract Timeline

13 Mar

Published

Current

Award Phase

Value Analysis

Contract value not disclosed

Market Activity

+36%

UK tender activity (12 months)

Refurbishment and Upgrade of Calf of Eday Lighthouse - Scope of Work

0 phases • 0 requirements • 0 capabilities
  • Description of Works
  • The Site
  • Location: Calf of Eday Minor Light is situated on the small island of Eday, to the Northeast of mainland Orkney (Latitude 59o 14.2’ N, Longitude 2o 45.7’ W).
  • Lighthouse Site: Access to the site is through an agreed right of access with the owner of Carrick Farm, Eday. This consists of a rough footpath through grazing fields (pasture and rough grazing), approx. 870m in length. The topography is relatively flat, with some sections of steeper ground across small burns. There are steep cliffs immediately to the seaward side of the access track.
  • On the landward side of the site, there is a small solar array bounded by a post and wire fence, and a set of concrete steps with galvanised steel handrail down to the lighthouse access walkway. This walkway itself is formed of galvanised steel which sits on stone piers.
  • The lighthouse itself is built on a concrete base within the intertidal zone and sits approximately 18.0m out from high tide level.
  • This project is to refurbish the lighthouse structure including replacement of the existing access ladder, balcony and lightroom with GRP equivalent, and full electrical re-work. There are minor repairs required to the existing access walkway and solar array.
  • Site Access
  • Due to the location of this site, the majority of materials and equipment will be transported to and from site via NLB Ship and Helicopter. See sections of NLB Helicopter manual for details of working with the helicopter included as an Appendix to the tender documents. There will additionally be a requirement to bring some sections of the new lightroom to site using a ‘multicat’ style low draught vessel with crane attachment.
  • The site can be accessed by boat, subject to local weather conditions, and on foot, as above. An agreement may be reached with the landowner regarding access through their fields using small ATVs, but this is not currently in place.
  • The Principal Contractor must also ensure that the condition of any access routes are monitored and any areas identified as hazardous are noted with details passed to their own employees, appointed sub-contractors, and all visiting NLB personnel. If necessary, suitable remedial and protective measures should be put in place to protect anyone on the site and the environment for the duration of the contract.
  • All materials for site establishment to be delivered to NLB Oban no later than 17 April 2026.
  • NLV Pharos and NLB Helicopter to deliver materials to site starting 28 April 2026, with block ending 3 May 2026, latest.
  • A mid-visit by NLV Pharos and NLB Helicopter is scheduled for 28-30 June 2026, inclusive.
  • Project works to be completed ahead of scheduled clearance by NLV Pharos and NLB Helicopter 29 August to 1 September 2026, inclusive.
  • Main elements of project as follows:
  • Carry out full asbestos survey of buildings where work will take place
  • Delivery of all plant/materials to site, and establish site
  • Establishment of site camp, to include welfare and accommodation for site staff for duration of the project
  • Erection of scaffolding or other suitable access to allow for works to existing lightroom
  • Demolition and removal from site of existing lightroom, balcony and access ladder
  • Template made of existing fixing holes in top of octagonal tower section
  • Fabrication, delivery to site (using multicat vessel or other suitable means) and install of new GRP lightroom, aluminium balcony and access ladder
  • Full electrical strip, including optic and solar panels, and install of new system
  • Full internal and external redecoration of the tower, including removal of lightning conductor system
  • Works to upgrade access bridge, including replacement of cross beams where corroded, infill of voids on masonry piers and replacement of some handrail elements
  • Rewire of solar array boundary fence
  • Demobilisation
  • Programme
  • All contractors must submit a detailed works programme, at tender stage, with a proposed work commencement date on site of 28 April 2026. We require flexibility on the programme to be able to cope with many variables including tides, weather etc. On award we agree a final programme of works.
  • It is important that Tenderers or their representative(s) attend the site visit, any Tenderers submitting a tender that have not attended the site visit, will not be considered. Site visits will be conducted on Wednesday 11 February 2026. Please request a site visit via Delta eSourcing attendance and names, mobile numbers of representatives attending site.

Ask the AI assistant for deeper analysis of this scope

Contract Value

Fixed PriceSingle contract value agreed upfront
Value not disclosed

Key Dates

Important deadlines and milestones

UK Time

Notice Published

Tender opportunity made public on Find a Tender

Fri, 13 Mar 2026
Passed

What This Northern Lighthouse Board Contract Means

For Citizens

This is a public procurement by Northern Lighthouse Board. All UK government contracts are publicly accessible for transparency.

For Businesses

This Northern Lighthouse Board contract has been awarded. Review for market intelligence.

Related Opportunities

Sector Overview

Buyer Network

Your Match Score

Complete your profile for personalized match scoring

Company Match Analysis

Analyze how well this tender matches your company profile and capabilities.

Market Activity

-41%

UK tender activity (12 months)

Northern Lighthouse Board

Contact Information

View All Contracts
Northern Lighthouse Board
Spending trends, sector breakdown & more →

Quick Facts

Stage
Award
Status
complete
CPV Codes
0

Reference ID

ocds-h6vhtk-060715

Win More UK Government Contracts

RFP.quest helps UK businesses find and win public sector tenders. Our AI platform analyzes requirements, identifies gaps, and helps craft winning proposals.

UK tender data from Find a Tender under the Open Government Licence. Powered by RFP.quest.

Tender Assistant

I can help you understand this Northern Lighthouse Board contract:

• Requirements and evaluation criteria • Risks and gaps analysis • Buyer and market context • Related opportunities

Ask me anything about "Refurbishment and Upgrade of Calf of Eday Lighthouse"!

Powered by CopilotKit