RFP QuestBeta
Awarded · ResultStage · contract

London Borough of Barking and Dagenham

Replacement Boilers and Mechanical Equipment: Fews/Kallar Lodge

ConstructionCPV 45331100
Value£170k
Awarded26 Mar 2021
Published24 Jun 2021
RegionLondon
Outcome — awarded

This is a contract result notice, not an open opportunity. Details from the official award data.

Contract value in context
£170ktotal contract value
median £158k
this tender£0£6.5m

This sits in the upper-middle of the Construction band — a substantial contract for the sector. Based on 64,002 valued Construction tenders in our corpus.

The brief

Award of Contract for: The project is to include the replacement of the existing heating boiler plant and associated mechanical equipment.

Fews Lodge and Kallar Lodge are supplied by a single boiler plant and pipe distribution system.

This project includes the removal of the existing boiler plant and associated equipment.

The new heating and hot water provision shall be separate for each facility (Fews Lodge and Kallar Lodge) and shall be located within the existing plant room.

By-pass pipework shall be included within the new design to enable heating provision to either facility in the event of boiler failure.

The by-pass will be isolated during normal operation of the plant.

The contractor is to include for separation of the existing heating and hot water distribution pipework to physically separate the provision for each facility.

Each of the new boiler plant and equipment shall be capable of providing heating and hot water services to all existing areas of the building.

The contractor is to separate the existing gas supply to the boiler room to enable metering to each facility.

Key requirements

What the supplier must deliver

01

The new heating and hot water provision

The new heating and hot water provision shall be separate for each facility (Fews Lodge and Kallar Lodge) and shall be located within the existing plant room.

02

By-pass pipework shall be included within

By-pass pipework shall be included within the new design to enable heating provision to either facility in the event of boiler failure.

03

Each of the new boiler plant

Each of the new boiler plant and equipment shall be capable of providing heating and hot water services to all existing areas of the building.

04

The contractor is to separate the existing

The contractor is to separate the existing gas supply to the boiler room to enable metering to each facility.

Derived from the notice text — always confirm against the original documents.

Buyer intelligence

Make the case to bid

Reveal who to approach at London Borough of Barking and Dagenham, and generate a go-to-market strategy from their news, accounts and people.

Source & provenance
OCID
9f22f1f9-0d83-419c-86b6-39d17e525015
Stage
contract · Contract
Source
Contracts Finder
Buyer ref
tender_257064/974571
View the original notice on Contracts Finder

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

Market context

Who wins this kind of work

The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.

Top suppliers & buyers in Construction

Scroll to explore the market network

London Borough of Barking and Dagenham’s tender network

Assembling the network…

Also open now

Similar open tenders

NCC1626 - Prudhoe Waterworld Boiler Replacement Works

Northumberland County Council

Closes 21 Aug 2026Construction
£180kValue

Framework Agreement for Cavity Wall Tie Replacement and Cavity Wall Insulation Extraction

City & County of Swansea

Closes 21 Aug 2026Construction
£1.9mValue